Tepee Creek Fish Passage Restoration
Salmonid Habitat Restoration and Acquisition
|
04-1716 R | Middle Columbia River | 12/03/2004 | 12/01/2008 | 2004 | Completed | 05/01/2025 | |
| |
Description
The Yakama Nation used this funding to replace 3 partial barriers on Tepee Creek to restore juvenile salmonid access to 8.7 miles of upstream habitat. Tepee Creek, a tributary to White Creek in the Klickitat River subbasin, provides important spawning and rearing habitat for ESA-listed Mid Columbia River steelhead. The White Creek watershed as a whole is likely the most important spawning and rearing tributary watershed within the Klickitat subbasin. In recent years, the White Creek watershed has accounted for up to 40% of the observed steelhead spawning in the entire Klickitat subbasin. Tepee Creek has accounted for up to 21% of the observed spawning in the Klickitat subbasin in recent years, however in most years it likely accounts for between 5% and 10%. Because of the very low to nonexistent base flow conditions at many spawning areas, post-emergence movement by steelhead fry and juveniles is critical to their survival. Access to refugia (in the form of perennially-flowing stream reaches or remnant pools in otherwise dry reaches) is necessary for successful rearing within this watershed.
Project Benefit
The goal of the project is to connect isolated freshwater in-stream habitat to increase the range and distribution of salmon. The objective of the project is to increase access to freshwater in-stream side channels, oxbows, and other channels.
The objective of the project is to increase access to areas blocked by human-caused impediments.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.01 |
|
Fish Passage |
Barriers Removed |
4 |
|
Miles Opened |
6.27 |
8.70 |
Funding Details |
PCSRF | $176,713 |
Other | $140,218 |
Report Total: | $316,931 |
|
| |
Worksites
3-Tepee Ck. Fish Passage Rest
- Worksite Identifier: 3-Tepee Ck. Fish Passage Rest
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia (170701)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Middle Columbia River
- Latitude: 46.15278148
- Longitude: -121.03867401
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 152,382.00
- . . C.0.b
Length of stream treated/protected 1.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Klickitat Lead Entity Region - Salmon Recovery Strategy |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 76,191.00
- . . . . C.2.b.1
Length of stream made accessible 1.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 1.00
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 76,191.00
- . . . . C.4.b
Total length of instream habitat treated .01
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .01
1-Tepee Ck. Fish Passage Rest
- Worksite Identifier: 1-Tepee Ck. Fish Passage Rest
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia (170701)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Middle Columbia River
- Latitude: 46.18066044
- Longitude: -121.02412727
ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 19,376.31
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Worksite # 1 was not constructed. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 19,376.31
- . . . . C.2.b.1
Length of stream made accessible .00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 0
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .00
4-White Creek-IXL Road Crossi
- Worksite Identifier: 4-White Creek-IXL Road Crossi
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia (170701)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Middle Columbia River
- Latitude: 46.17997984
- Longitude: -121.02553134
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 152,382.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Klickitat Lead Entity Region - Salmon Recovery Strategy |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 76,191.00
- . . . . C.2.b.1
Length of stream made accessible 2.77
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 2
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 2
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 2.77
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 76,191.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .01
2-Tepee Ck. Fish Passage Rest
- Worksite Identifier: 2-Tepee Ck. Fish Passage Rest
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Columbia (170701)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Middle Columbia River
- Latitude: 46.15908204
- Longitude: -121.04005294
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 152,383.00
- . . C.0.b
Length of stream treated/protected 2.50
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Klickitat Lead Entity Region - Salmon Recovery Strategy |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 152,383.00
- . . . . C.2.b.1
Length of stream made accessible 2.50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 2.50
|
|