Lower Beaver Piping 04
Salmonid Habitat Restoration and Acquisition
|
04-1688 R | Upper Columbia River | 01/15/2005 | 05/31/2007 | 2004 | Completed | 05/01/2025 | |
| |
Description
This project piped two irrigation ditches in the Beaver Creek watershed (tributary to the Methow River). Nearly 8,000 feet of pipe was installed to eliminate ditch water loss of approximately 1.5 to 2.25 cfs of water.
Project Benefit
The goal of the project is to increase and/or maintain adequate flows for wild salmon. The objective of the project is to reduce waste of appropriated water.
Funding Details |
PCSRF | $214,832 |
In-Kind Donated Labor | $10,000 |
Report Total: | $224,832 |
|
| |
Worksites
2-Lower Beaver Piping-Miller
- Worksite Identifier: 2-Lower Beaver Piping-Miller
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 48.36637533
- Longitude: -120.03233898
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 1.00
- . . C.0.b
Length of stream treated/protected 14.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Beaver Creek Coordinated Resource Management Plan (CRM) |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 1.00
- . . . . C.3.b
Length of stream 'protected' for adequate flow 7.00
- . . . . C.3.c
Change in water flow1 (cfs)
- . . . . C.3.e.1
Irrigation practice improvementY (Y/N)
- . . . . . . C.3.e.2
Acre feet of water conserved per year3500 (Acre feet)
- . . . . . . C.3.e.3
cfs (cubic feet per second) of water conserved1 (cfs)
- . . . . . . C.3.e.4
Initial start date of action or agreement05/01/2005 (mm/dd/yyyy)
- . . . . . . C.3.e.5
Final end date of action or agreement10/01/2005 (mm/dd/yyyy)
1-Lower Beaver Piping-Fort Th
- Worksite Identifier: 1-Lower Beaver Piping-Fort Th
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Upper Columbia (170200)
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Upper Columbia River
- Latitude: 48.34314937
- Longitude: -120.03314996
ESU
- Upper Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 254,517.75
- . . C.0.b
Length of stream treated/protected 14.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Beaver Creek Coordinated Resource Management Plan (CRM) |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.3
Instream Flow ProjectY (Y/N)
- . . . . C.3.a
Instream Flow Funding 254,517.75
- . . . . C.3.b
Length of stream 'protected' for adequate flow 7.00
- . . . . C.3.c
Change in water flow2 (cfs)
- . . . . C.3.e.1
Irrigation practice improvementY (Y/N)
- . . . . . . C.3.e.2
Acre feet of water conserved per year5462 (Acre feet)
- . . . . . . C.3.e.3
cfs (cubic feet per second) of water conserved1.5 (cfs)
- . . . . . . C.3.e.4
Initial start date of action or agreement05/01/2005 (mm/dd/yyyy)
- . . . . . . C.3.e.5
Final end date of action or agreement10/01/2006 (mm/dd/yyyy)
|
|