Lassen Tributaries Post-Dixie Fire Watershed Assessment

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination Salmonid Habitat Assessment / Inventory
Project ID1702410893183
Recovery DomainsCentral Valley
Start Date04/04/2024
End Date07/31/2026
Year2022
StatusOngoing
Last Edited05/01/2025
 
1 - 1

Description    


The Lassen Tributaries Post-Dixie Fire Watershed Assessment is a multi-faceted planning project between the Sierra Institute, Lassen National Forest, Point Blue Restoration Sciences, and the South Lassen Watersheds Group to develop and prioritize shovel-ready stream and meadow restoration projects across the Antelope, Battle, Deer, and Mill Creek watersheds. The Project will develop and prioritize implementation activities covered under the West Lassen Headwaters NEPA ? a 140,000 acre public lands planning effort with a decision expected in Spring 2024. The proposed stream and meadow prioritization will enable rapid implementation post-NEPA decision to improve the resilience of these critical watersheds.

Project Benefit    


Headwater restoration projects have been shown to reduce upland erosion, enhance groundwater storage, increase sediment storage, and increase structural complexity in degraded stream reaches. The result of project identified actions, when implemented, will boost the supply of cold and clean water into project watersheds, which has been identified as a critical component for the recovery of winter and spring run Chinook and Steelhead in the Sacramento River(NMFS, 2014).

Accomplishments

Metric Completed Originally
Proposed
Planning and Assessment
  Stream Miles Assessed 13.00

Funding Details

SourceFunds
PCSRF$453,070
In-Kind Other$23,167
Report Total:$476,237


Project Map



Worksites

1702410893611    


  • Worksite Identifier: 1702410893611
  • Start Date:
  • End Date:
Area Description
Center Point of Assessment Area

Location Information

  • Basin: Lower Sacramento (180201)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: Central Valley
  • Latitude: 40.3023986
  • Longitude: -121.5189971

ESU

  • Central Valley Spring-run ESU
  • Central Valley Fall and Late Fall-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.12 Developing restoration/action planY (Y/N)
      •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
        •      . . . . B.2.a Habitat Assessment Funding
        •      . . . . B.2.b.1 Watershed AssessmentY (Y/N)
        •      . . . . B.2.c Instream SurveyY (Y/N)
          •      . . . . . . B.2.c.1 Type of instream survey (LOV)
          •      . . . . . . B.2.c.2 Stream miles assessed
        •      . . . . B.2.d Habitat surveysY (Y/N)
          •      . . . . . . B.2.d.1 Type of habitat survey/assessment (LOV)
          •      . . . . . . B.2.d.2 Amount of habitat assessed