Lindsay Creek Off-Channel Coho Habitat Improvement Project
Salmonid Habitat Restoration and Acquisition
|
1671664693468 | N Central California Coast | 04/14/2023 | 03/31/2027 | 2022 | Ongoing | 05/01/2025 | |
| |
Description
This implementation project will construct the CDFW-approved 100% engineered designs for improving off-channel habitat in Lindsay Creek and the oxbow. Specifically, the project will reconfigure the geometry of an existing partially abandoned oxbow along the mainstem channel to allow for more frequent and longer duration flooding during high to moderate flow events. The new geometry will ensure fish passage in and out of the oxbow. This project will also significantly increase the area inundated during lower flooding events. Large woody material (LWM) will be added throughout the project footprint to enhance refugia habitat.
Project Benefit
The expected benefits from this project include improved off-channel habitat conditions for salmonids in Lindsay Creek. Specifically, this project will allow for more frequent and longer duration of high flow connectivity between a mostly abandoned oxbow channel and the main stem of Lindsay Creek, thereby providing velocity refuge, cover, and feeding opportunities for juveniles during high flow events outside the incised main channel. The project will create 0.73 acres of off-channel habitat.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.15 |
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
|
.15 |
Funding Details |
PCSRF | $639,421 |
In-Kind Other | $56,449 |
Report Total: | $695,870 |
|
| |
Worksites
1671664693807
- Worksite Identifier: 1671664693807
- Start Date:
- End Date:
Area Description
Lindsay Creek Oxbow Location
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.94792
- Longitude: -124.041269
ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding
- . . . . C.2.b.1
Length of stream made accessible
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
|
|