Weston-Champagne Cachagua Creek Fish Passage Project
Salmonid Habitat Restoration and Acquisition
|
1641938754872 | S. California - S. Central CA Coast | 06/23/2022 | 01/13/2025 | 2021 | Completed | 05/01/2025 | |
| |
Description
The Project remedied a barrier to steelhead migration on Cachagua Creek. The site is a concrete ford, identified as the #2 Priority fish passage barrier in the Carmel River system. The Project removed the existing concrete ford and replaced it with a single span bridge in the same crossing alignment, designed to improve upstream migration conditions for steelhead. A pool will be installed just downstream. The Project also improved flood conveyance and provides safe vehicle access across Cachagua Creek to several private properties. All FY18 PCSRF funds were spent within the award period.
Project Benefit
The ford removal and replacement with a free span bridge will improve migration conditions in this important reach of Cachagua Creek for juvenile and adult steelhead trout at all modeled fish passage flows for access to 8.3 miles of upstream steelhead habitat and improve flood conveyance. The proposed bridge deck height will balance the streams function to pass smaller floods and fish passage flows with the risk of debris loading during very large floods.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
8.30 |
8.30 |
Funding Details |
PCSRF | $594,998 |
State | $109,348 |
Other | $261,118 |
Report Total: | $965,464 |
|
| |
Worksites
1641938755153
- Worksite Identifier: 1641938755153
- Start Date:
- End Date:
Area Description
Weston-Champagne Ford
Location Information
- Basin: Central California Coastal (180600)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 36.391714
- Longitude: -121.631107
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 965,464.00
- . . C.0.b
Length of stream treated/protected .03
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 965,464.12
- . . . . C.2.b.1
Length of stream made accessible 8.30
- . . . . C.2.b.2
Square miles of streambed made accessible.1 (Square miles)
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.d.1
Fishway chutes or pools installedY (Y/N)
- . . . . . . C.2.d.2
Number of fishway chutes/pools installed 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 8.30
|
|