Mattole Watershed Mid-River Large Wood Augmentation Planning Project
Salmonid Restoration Planning and Assessments
|
1611968224042 | N Central California Coast | 06/07/2021 | 01/02/2025 | 2020 | Completed | 05/01/2025 | |
| |
Description
The project: (1) used field visits and hydraulic modeling to characterize 27 miles of Mattole River and high priority tributary streams; 2) developed a Large Wood Augmentation Plan for the reaches; 3) Completed 100% design for at least 150 non-engineered large wood structures over a minimum cumulative reach length of seven miles (in low risk and smaller channels w/ BFW<35), and 100% design for 15 engineered wood structures in larger/higher risk channels to treat at least 3000 feet of higher risk stream channel.
Project Benefit
Implementation of the instream features designed in this project will improve spawning conditions by forcing the development of pool-riffle morphology in plane bed channels and causing deposition of gravel in reaches currently dominated by larger material, reducing local shear stress and decrease the chance of redd scour; and will improve rearing conditions by greatly increasing the availability of velocity refuge from high flows, improving access to floodplains, and increasing instream cover.
Funding Details |
PCSRF | $181,404 |
Other | $112,330 |
In-Kind Donated Labor | $24,557 |
Report Total: | $318,291 |
|
| |
Worksites
1611968224267
- Worksite Identifier: 1611968224267
- Start Date:
- End Date:
Area Description
Honeydew Creek, campground reach
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.22907
- Longitude: -124.10967
ESU
- California Coastal Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 318,291.00
- . . B.0.b.1
Area Encompassed 22.8
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 318,291.34
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
Name of plan implemented | |
None |
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
None |
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
None |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
None |
|
|