Mattole Watershed Mid-River Large Wood Augmentation Planning Project

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID1611968224042
Recovery DomainsN Central California Coast
Start Date06/07/2021
End Date01/02/2025
Year2020
StatusCompleted
Last Edited05/01/2025
 
1 - 1

Description    


The project: (1) used field visits and hydraulic modeling to characterize 27 miles of Mattole River and high priority tributary streams; 2) developed a Large Wood Augmentation Plan for the reaches; 3) Completed 100% design for at least 150 non-engineered large wood structures over a minimum cumulative reach length of seven miles (in low risk and smaller channels w/ BFW<35), and 100% design for 15 engineered wood structures in larger/higher risk channels to treat at least 3000 feet of higher risk stream channel.

Project Benefit    


Implementation of the instream features designed in this project will improve spawning conditions by forcing the development of pool-riffle morphology in plane bed channels and causing deposition of gravel in reaches currently dominated by larger material, reducing local shear stress and decrease the chance of redd scour; and will improve rearing conditions by greatly increasing the availability of velocity refuge from high flows, improving access to floodplains, and increasing instream cover.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$181,404
Other$112,330
In-Kind Donated Labor$24,557
Report Total:$318,291


Project Map



Worksites

1611968224267    


  • Worksite Identifier: 1611968224267
  • Start Date:
  • End Date:
Area Description
Honeydew Creek, campground reach

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.22907
  • Longitude: -124.10967

ESU

  • California Coastal Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 318,291.00
    •      . . B.0.b.1 Area Encompassed 22.8
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 318,291.34
      •      . . . . B.1.b.8 Conducting habitat restoration scoping and feasibility studiesY (Y/N)
        •      . . . . . . B.1.b.8.a
          Name of plan implemented
          None
        •      . . . . . . B.1.b.8.b
          Description and scope of the plan implemented
          None
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
          None
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
          None