Middle Mission Restoration Phase 3
Salmonid Habitat Restoration and Acquisition
|
004 23 CW | Snake River | 11/29/2023 | 10/31/2025 | 2023 | Ongoing | 04/17/2025 | |
| |
Description
The Nez Perce Soil and Water Conservation District (NPSWCD) will install 2 acres of riparian and upland planting, 800 feet of fence, 3 boulder clusters, and 3 wood structures along 0.53 miles of Mission Creek, Idaho. These metrics were not completed in a previously funded PCSRF project (013 19 CW) due to funding and time constraints.
Project Benefit
The project goals include 1) restoration of channel function, 2) improve aquatic habitat suitability, and 3) reduce elevated water temperatures for salmonids.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.53 |
Riparian Habitat |
Stream Miles Treated |
|
.08 |
Acres Treated |
|
2.0 |
Upland Habitat |
Acres Treated |
|
.1 |
Funding Details |
PCSRF | $73,514 |
State | $6,100 |
Other | $18,283 |
Report Total: | $97,897 |
|
| |
Worksites
WS 1
- Worksite Identifier: WS 1
- Start Date: 11/29/2023
- End Date: 10/31/2025
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Clearwater (170603)
- Subbasin: Clearwater (17060306)
- Watershed: Lapwai Creek (1706030612)
- Subwatershed: Mission Creek (170603061203)
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 46.302431
- Longitude: -116.711593
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement
- . . . . . . C.4.d.7
Number of structures placed in channel
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
|
- . . . . . . C.5.c.3
Acres planted in riparian
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream
- . . . . . . C.5.d.3
Acres of riparian area protected by fencing
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding
- . . . . C.6.b.1
Acres of upland habitat area treated
- . . . . C.6.f.1
Planting for erosion and sediment controlY (Y/N)
- . . . . . . C.6.f.2
Species of plants planted for erosion and sediment control | |
|
- . . . . . . C.6.f.3
Acres planted for erosion and sediment control
|
|