Description
The project addresses limiting factors to rearing and spawning habitat in a 2,045 ft. high habitat-potential reach of Tannery Creek. Though original designs specify 42 logs and 3 root wads, the Construction Contractor and Project Engineer modified the design to add 8 logs and place additional small wood debris to enhance structures for more complex interaction with the streambed. Final project count was 50 logs plus 3 root wads.
Project Benefit
Enhance rearing and spawning habitat for Coho salmon by placing 50 ft+ locally recruited logs and rootwads at 42 sites along a 2,045-ft reach of Tannery Creek, placed to scour and enhance pools, retain spawning gravel, provide cover and high-flow refugia, and enhance habitat complexity.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.40 |
.40 |
Funding Details |
PCSRF | $190,464 |
In-Kind Other | $63,000 |
Report Total: | $253,464 |
|
| |
Worksites
1551969283801
- Worksite Identifier: 1551969283801
- Start Date:
- End Date:
Area Description
Tannery Creek Large Wood Recruitment Project 2018
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin: Gualala-Salmon (18010109)
- Watershed: Salmon Creek-Frontal Pacific Ocean (1801010902)
- Subwatershed: Salmon Creek (180101090201)
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 38.355678
- Longitude: -122.982625
ESU
- Central California Coast Coho Salmon ESU
- Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 253,464.00
- . . C.0.b
Length of stream treated/protected .40
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Salmon Creek Integrated Coastal Watershed Management Plan, GRRCD and PCI, 2010. Sebastopol, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 253,463.52
- . . . . C.4.b
Total length of instream habitat treated .40
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .40
- . . . . . . C.4.d.4
Acres of streambed treated through channel structure placement .2
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 38
- . . . . . . C.4.d.7
Number of structures placed in channel 51
|
|