AK56006 | - | 03/01/2023 | 11/30/2026 | 2023 | Ongoing | 05/01/2025 | |
| |
Description
This project will replace a fish passage barrier at the road/stream crossing of Peterson Creek and Wachusetts Street that is currently failing, undersized, perched, and rated ‘red’ by Alaska Department of Fish and Game (ADF&G) standards. In the summer of 2024, this crossing will be replaced by a new structure that facilitates natural stream function and provides flood resiliency. This is the final phase of a partnership between the City and Borough of Sitka (CBS) and the U.S. Fish and Wildlife Service (USFWS) to design and replace two failing culverts that have blocked fish passage on Peterson Creek.
Project Benefit
This project replaces the last fish passage barrier in Peterson Creek, reconnecting 1.09 km of high quality spawning and rearing habitat for coho and pink salmon. The new culvert will also be rated to accommodate 100-year peak flow, reducing the risk of large flooding events.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
|
.68 |
Funding Details |
Other | $883,371 |
Report Total: | $883,371 |
|
| |
Worksites
52638503
- Worksite Identifier: 52638503
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Baranof Island (19010212)
- Watershed: Sitka Sound (1901021212)
- Subwatershed: Sitka Sound (190102121206)
- State: Alaska
- Recovery Domain:
- Latitude: 57.062509
- Longitude: -135.344525
ESU
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding
- . . . . C.2.b.1
Length of stream made accessible
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade
|
|