Peterson Creek Fish Passage Improvements
Salmonid Habitat Restoration and Acquisition
|
AK54011 | - | 03/01/2021 | 11/30/2021 | 2020 | Completed | 05/01/2025 | |
| |
Description
This project replaced a failing 48-in CMP culvert with a 15-ft wide aluminum arch culvert with an anticipated service life of greater than 50 years. Installation included substrate in the culvert that mimics the natural stream bed, accommodates 100-peak flow, and restores fish passage and natural channel function.
Project Benefit
The primary benefit of this project is improved habitat connectivity for coho and pink salmon. The new Peterson Street crossing will open 0.12 km of stream habitat up to the Wachusetts Street crossing, which is slated for replacement next. Ultimately, when both Peterson and Wachusetts Street crossings are replaced, a total of 1.2 km of stream habitat will be reconnected, but the lower Peterson Street culvert is the necessary first step.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
.07 |
.07 |
Funding Details |
PCSRF | $125,000 |
Other | $1,255,000 |
Report Total: | $1,380,000 |
|
| |
Worksites
48584981
- Worksite Identifier: 48584981
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Central Southeast Alaska (190102)
- Subbasin: Baranof Island (19010212)
- Watershed: Sitka Sound (1901021212)
- Subwatershed: Sitka Sound (190102121206)
- State: Alaska
- Recovery Domain:
- Latitude: 57.0616
- Longitude: -135.3436
ESU
- Un-Named ESU Coho
- Un-Named ESU Pink
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 1,380,000.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 1,380,000.00
- . . . . C.2.b.1
Length of stream made accessible .07
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .07
|
|