Staney Creek East Middle Fork Restoration - Phase 2
Salmonid Habitat Restoration and Acquisition
|
AK44175 | - | 03/01/2018 | 02/28/2019 | 2014 | Completed | 05/01/2025 | |
| |
Description
In 2018, this project improved stream habitat on a 0.5 km reach of Staney Creek, known as EMF2, on Prince of Wales Island. This was accomplished by placing approximately 200 second growth rootwad trees and four old-growth tip trees in side channels, on the floodplain, and in 12 instream structures. These structures increased channel complexity, creating pools and off-channel habitat throughout the .5 km reach and stabilizing stream banks in about .08 km of the same reach.
Project Benefit
This project will maintain and enhance fish habitat by: improving habitat conditions for juvenile salmonids; accelerating recovery of fluvial processes currently leading to bank erosion and channel widening; improving pool frequency and complexity through placement of rootwad trees; improving year-round holding and rearing habitat through pool creation and floodplain connectivity; and improving floodplain conditions by providing nurse logs and roughness elements for flood resilience.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.35 |
.40 |
Funding Details |
PCSRF | $55,490 |
Other | $55,064 |
Report Total: | $110,554 |
|
| |
Worksites
43365218
- Worksite Identifier: 43365218
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Southern Southeast Alaska (190101)
- Subbasin: Prince of Wales (19010103)
- Watershed:
- Subwatershed:
- State: Alaska
- Recovery Domain:
- Latitude: 55.747
- Longitude: -133.0226
ESU
- Un-Named ESU Coho
- Un-Named ESU Steelhead
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 110,554.00
- . . C.0.b
Length of stream treated/protected .35
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 110,554.00
- . . . . C.4.b
Total length of instream habitat treated .35
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .35
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 6
- . . . . . . C.4.d.6
Yards of average stream-width at mid-point of channel structure placement project17 (Yards)
- . . . . . . C.4.d.7
Number of structures placed in channel 12
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .05
|
|