Kabusie Bridge Restoration Project
Salmonid Habitat Restoration and Acquisition
|
12-MAKA-04 | - | 08/01/2015 | 12/31/2015 | 2012 | Completed | 05/01/2025 | |
| |
Description
Project funds were used to supplement budget costs for construction for an arched concrete bridge at the Kabusie Creek crossing on the BIA Public Road Makah Passage, located on the Makah Reservation. This project was a major milestone in our Tsoo-Yess Basin Anadromous Passage project to re-establish stream habitat floodplain connectivity between the Tsoo-Yess River and its associated floodplain. A concrete bridge replaced the impassable non-functioning culvert. This project was designed to directly benefit fish production by restoring fish passage to one mile of habitat. Planning and preparation for the project started many years ago, however installation was completed during the summer of 2015.
Project Benefit
Tsoo-Yess River limiting factors addressed are loss of tributary spawning habitat due to fish blocking structures and loss of tributary contributions to summer base flows in the Tsoo-Yess River.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
1.00 |
1.00 |
Funding Details |
PCSRF | $44,097 |
Other | $128,975 |
Report Total: | $173,072 |
|
| |
Worksites
Kabusie Bridge Site
- Worksite Identifier: Kabusie Bridge Site
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Hoh-Quillayute (17100101)
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 48.28263385725266
- Longitude: -124.63318567167552
ESU
- Olympic Peninsula Coho Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 173,072.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 173,072.00
- . . . . C.2.b.1
Length of stream made accessible 1.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 1.00
|
|