Continue Water Quality Monitoring and Data Analysis in the Upper Klamath Basin
Salmonid Research, Monitoring, and Evaluation (RM&E)
|
KLAMATH-2013-1 | - | 09/30/2013 | 09/30/2015 | 2013 | Completed | 05/01/2025 | |
| |
Description
During the funding period (July 2013 – September 2015), the Klamath Tribes continued the long-term Upper Klamath Basin water quality monitoring program, collecting samples from 25 sites (Figure 1). Overall, water quality technicians completed 1151 sampling events (Appendix A: Tables 1-3) in the Sprague, Williamson, and Wood River basins and in Upper Klamath and Agency Lakes.
Project Benefit
Funding of this project will continue to provide several benefits to salmonid recovery and reintroduction efforts in the entire Klamath River watershed. First, this data set provides valuable baseline data for downstream recovery efforts. Second, program efforts are a tool to focus and direct upper basin restoration efforts and to guide reintroduction efforts. Finally, additional data set refining will encourage more widespread use of this data set by all restoration practitioners.
Accomplishments
Research and Monitoring |
Stream Miles Monitored |
193.00 |
193.00 |
Funding Details |
PCSRF | $20,290 |
Report Total: | $20,290 |
|
| |
Worksites
Upper Klamath Lake
- Worksite Identifier: Upper Klamath Lake
- Start Date: 09/30/2013
- End Date:
Area Description
Upper Klamath Lake
Location Information
- Basin: Klamath (180102)
- Subbasin: Upper Klamath Lake (18010203)
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain:
- Latitude: 42.401393687884344
- Longitude: -121.90118461847054
ESU
- California Coastal Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- E.0
Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
- . . E.0.a
RM&E Funding 20,290.00
- . . E.0.b
Complement habitat restoration project | |
None |
- . . E.0.c
Project identified in a plan or watershed assessment. | |
None |
- . . E.0.d.1
Number of Cooperating Organizations 0
- . . E.0.d.2
Name Of Cooperating Organizations. | |
None |
- . . E.0.e.1
Number of reports prepared 1
- . . E.0.e.2
Name Of Report | |
Final Report Fy2013 |
- . . E.1
MonitoringY (Y/N)
- . . . . E.1.a
Monitoring funding 20,290.00
- . . . . E.1.b.1
Stream Miles Monitored 193.00
- . . . . E.1.b.2
Acres of Watershed Area Monitored 2,060,800.0
- . . . . E.1.c.8
Water quality monitoringY (Y/N)
- . . . . . . E.1.c.8.a
# miles (to nearest 0.01 mile) of stream monitored for water quality 193.00
- . . . . E.1.d
Name Of Comprehensive Monitoring Strategy/Program | |
none |
|
|