Makah U&A Salmon Habitat Restoration
Salmonid Habitat Restoration and Acquisition
|
100003 | Ozette Lake | 07/01/2002 | 09/30/2003 | 2002 | Completed | 05/01/2025 | |
| |
Description
Project consists of planned and opportunistic supplementation of salmon recovery efforts in the Makah U&A through instream habitat improvements, riparian restoration, barrier removal and habitat assessment.
Project Benefit
Contribute to recovery of aquatic ecosystems within the Makah U&A and increase public awareness and involvement in salmon recovery.
Accomplishments
Instream Habitat |
Stream Miles Treated |
2.84 |
2.84 |
Riparian Habitat |
Stream Miles Treated |
.94 |
|
Acres Treated |
.9 |
|
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
3.00 |
.00 |
Funding Details |
PCSRF | $27,955 |
Report Total: | $27,955 |
|
| |
Worksites
1000005
- Worksite Identifier: 1000005
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Queets-Quinalt
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 47.6748235770615
- Longitude: -124.158942751808
ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 6,989.00
- . . C.0.b
Length of stream treated/protected 2.84
- . . C.0.d.3
Monitoring text (from Phase I) | |
Brownes Creek: monitor pre-treatment conditions and post-treatment response of geomorphic and habitat conditions, which included 16 cross-sections, a 10,000-foot longitudinal profile survey, surface bed material size sampling, photo points, and habitat template surveys. |
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 6,989.00
- . . . . C.4.b
Total length of instream habitat treated 2.84
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
20023366
- Worksite Identifier: 20023366
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Hoh-Quillayute
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 48.345430146454
- Longitude: -124.678747651184
ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 6,988.00
- . . C.0.b
Length of stream treated/protected .94
- . . C.0.d.3
Monitoring text (from Phase I) | |
Waatch Creek: Monitoring includes 28 cross-sections, a 5000 foot longitudinal profile survey, a stream gage, a continuous turbidity meter, suspended sediment sampling, benthic invertebrate sampling, surface bed material size sampling, subsurface fine sediment sampling, photo points, and control surveys on a nearby stream. |
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 6,988.00
- . . . . C.5.b.1
Total riparian miles streambank treated .94
- . . . . C.5.b.2
Total Riparian Acres Treated .9
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
20023371
- Worksite Identifier: 20023371
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Hoh-Quillayute
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain: Ozette Lake
- Latitude: 48.1798164800459
- Longitude: -124.705308728905
ESU
- Ozette Lake Sockeye Salmon ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 6,989.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.d.3
Monitoring text (from Phase I) | |
Project entailed biological monitoring of Lake Ozette Tributary conditions. |
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 6,989.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
20025496
- Worksite Identifier: 20025496
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Hoh-Quillayute
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 48.3206477085883
- Longitude: -124.659444128153
ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 6,989.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.d.3
Monitoring text (from Phase I) | |
Monitored to assess the success of culvert removals. |
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 4,989.00
- . . . . C.2.b.1
Length of stream made accessible 3.00
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 8
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 3.00
- . . C.8
Wetland ProjectY (Y/N)
- . . . . C.8.a
Wetland funding 2,000.00
- . . . . C.8.b
Total acres of wetland area treated .0
- . . . . C.8.d.1
Wetland plant removal/controlY (Y/N)
- . . . . . . C.8.d.3
Acres of wetland treated .0
- . . . . C.8.f.1
Artificial wetland createdY (Y/N)
- . . . . . . C.8.f.2
Artificial wetland acres created .0
|
|