Project 2011-004-00:ODFW Operation & Maintenance (O&M), Contract 74313 REL 99:2011-004-00 EXP ODFW OPERATION & MAINTENANCE

Instream Habitat

Instream Habitat
Project IDBPA_2011-004-00_74313 REL 99
Recovery Domains -
Start Date07/01/2021
End Date06/30/2022
StatusCompleted
Last Edited11/10/2021
 
1 - 1

Description    


Project 2011-004-00:

https://www.cbfish.org/Project.mvc/Display/2011-004-00



This project will provide the funding necessary for ODFW to implement the Willamette Wildlife MOA between BPA and the State of Oregon and to assist with restoration and/or operations and maintenance work that is required on acquisitions funded through the MOA and those that were accomplished prior to the MOA.



Contract 74313 REL 99:

https://www.cbfish.org/Contract.mvc/Summary/74313 REL 99



In 2021-2022, the program is currently directly caretaking seven properties and providing funds to support staff and purchase equipment and supplies to undertake O&M activities. The contract also supports the ongoing efforts to acquire new mitigation properties and the compliance monitoring program of all 47 previously acquired easements.



In 2010, the State of Oregon and Bonneville Power Administration (BPA) entered into a fifteen year agreement to permanently settle wildlife mitigation responsibilities for the federal Willamette River Basin Flood Control and Hydroelectric Project in the Willamette subbasin. The Willamette Project includes 13 multi-purpose dams and reservoirs as part of the Federal Columbia River Power System. The Parties to the Willamette River Basin Memorandum of Agreement Regarding Wildlife Protection and Enhancement (MOA) determined that settlement would be accomplished through the protection of an agreed number of acres that, once protected, would permanently settle the federal mitigation requirement. BPA agreed to provide specific funding amounts for the purchase of lands in fee title or conservation easement, as well as the protection and maintenance of this acreage. These annual budgets reflect the agreed upon yearly amounts of funding for the operations and maintenance of the WWMP by ODFW. Since 2010 ODFW has had an annual PISCES contract for program O&M, and every year the budget grows as staff are added and the program reaches full capacity.





Project Map



Worksites

BPA - BPA_2011-004-00_74313 REL 99-ws-584851: R: 29. Increase Aquatic and/or Floodplain Complexity    


  • Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 99-ws-584851: R: 29. Increase Aquatic and/or Floodplain Complexity
  • Start Date: 07/01/2021
  • End Date: 11/01/2021
Area Description

GAWA: Add LWD into floodplain channels and wetland area to measure effects of increasing complexity on GAWA and provide amphibian habitat, Gail Achterman Wildlife Area

Additional Detail

Work Statement Element 160732:

https://www.cbfish.org/WorkStatementElement.mvc/Summary/160732



With input from the Willamette BiOp HTT, ODFW staff will sideline trees into already established side channels to increase LWD component and complexity in side channels on GAWA. LWD will be added to the wapato area to provide turtle basking sites.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 44.9213
  • Longitude: -123.112965

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 2,906.56
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00