Project 2003-012-00:Shillapoo Wildlife Mitigation, Contract 74314 REL 114:2003-012-00 EXP PROTECT SHILLAPOO WILDLIFE AREA (WDFW-SHIL)
Estuarine/Nearshore; Instream Habitat; Riparian Habitat; Upland Habitat And Sediment; Water Quality
|
BPA_2003-012-00_74314 REL 114 | - | 10/01/2020 | 09/30/2021 | Completed | 11/10/2021 | |
| |
Description
Project 2003-012-00:
https://www.cbfish.org/Project.mvc/Display/2003-012-00
The Shillapoo Wildlife Area (SWA) was initially approved as a BPA wildlife mitigation project in 1996 and was re-approved for funding in 2002 as part of the Northwest Power Planning Councils (NWPPC) Provincial/Sub-Basin Planning Process. This project is located in the Lower Columbia Province (Lake River Sub-Basin) and partially addresses wildlife losses due to adverse impacts caused by construction of Bonneville, The Dalles and John Day dams. Land acquisition and management programs to meet mitigation objectives have been under way since 1996 on the SWA. Continued operation, maintenance and enhancement activities funded by BPA are necessary to maintain and enhance wildlife habitat benefits and to ensure BPAs mitigation obligation is met.
Ongoing Maintenance and enhancement work includes restoration of approximately 650 acres of wetland plant communities within the drained Shillapoo Lakebed and management/enhancement of other smaller wetland basins throughout the wildlife area. This primary enhancement focus is envisioned to provide wintering habitat for Canada geese, other waterfowl and sandhill cranes while increasing the overall habitat and wildlife diversity in the area.
Tree and shrub planting will occur along approximately 1 3/4 miles of riparian zone on the west bank of Lake River and in other areas to restore or improve riparian habitat. Some of these areas require that exotic vegetation (usually Himalayan Blackberry) be removed prior to planting making these projects multiple year endeavors. Tree planting will also occur in selected wetland and Oak habitat to improve habitat conditions for indicator species including Great Blue Heron, Yellow Warbler, mink and other species.
Other ongoing maintenance activities include fence maintenance, noxious weed and brush control, and waterfowl forage improvements much of which is accomplished though agreements with coop
Contract 74314 REL 114:
https://www.cbfish.org/Contract.mvc/Summary/74314
Worksites
BPA - BPA_2003-012-00_74314 REL 114-ws-571416: O: 47. Plant Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571416: O: 47. Plant Vegetation
- Start Date: 10/01/2020
- End Date: 02/18/2021
Area Description
SOUTH UNIT (Buckmire Slough)--Plant Trees & Shrubs, Buckmire Slough Site
Additional Detail
Work Statement Element 155354:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155354
Plant trees and shrubs in an 80 acre riparian zone where needed to achieve desired habitat characteristics. Prior site preparation is an ongoing process and still needed in some areas prior to planting.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.685814
- Longitude: -122.749718
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 3,018.97
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.3
Acres planted in riparian 5.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571418: H: 38. Improve Road for Instream Habitat Benefits
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571418: H: 38. Improve Road for Instream Habitat Benefits
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
Improve Interior Roads and Travel Routes in Support of Other Activities, random point
Additional Detail
Work Statement Element 155356:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155356
Brush/debris cleared, gravel placed only in problem areas along up to eight miles of "travel routes." The intent is not to develop formal roads throughout the wildlife area but rather to facilitate travel both on foot and by vehicle to work locations.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.686647
- Longitude: -122.746386
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 7,245.52
- . . . . C.6.c.1
Road drainage system improvements and reconstructionY (Y/N)
- . . . . . . C.6.c.2
Miles of road treated for drainage system improvements and reconstruction 8.00
BPA - BPA_2003-012-00_74314 REL 114-ws-571409: G: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571409: G: 199. Remove Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
Moist Soil Management/ Control of Reed Canary Grass, Twin Ponds wetland
Additional Detail
Work Statement Element 155347:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155347
Mechanical, chemical, and cultural control of reed canary grass to facilitate re-establishment of beneficial wetland plants. Selected wetlands will be treated with an herbicide in the fall to kill reed canary grass, then inundated with water during the winter, and if needed disked and planted with a cover crop in the spring. Disking will release the natural seed bank in the soil and the cover crop will help inhibit the germination of canary grass in the spring and fall. Success varies annually and from site to site based on weather and soil moisture conditions. Repeat treatments will be necessary to maintain desirable plants on a 3-5 year schedule which will vary by individual site conditions including hydro-period, water depth and topography.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.683171
- Longitude: -122.74788
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 17,107.48
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 5.0
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 17,107.48
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 50.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571415: N: 47. Plant Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571415: N: 47. Plant Vegetation
- Start Date: 10/01/2020
- End Date: 02/18/2021
Area Description
LAKE RIVER (Riparian Zone)-- Plant Trees & Shrubs, Lake River enhancement site
Additional Detail
Work Statement Element 155353:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155353
Plant trees and Shrubs in Lake River riparian zone. Planting has occurred since FY07 and the initial plantings are completed, however replanting is still occurring to replace trees and shrubs that did not survive.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.717139
- Longitude: -122.730229
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 5,031.61
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.3
Acres planted in riparian 20.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571441: U: 27. Remove Debris
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571441: U: 27. Remove Debris
- Start Date: 10/01/2020
- End Date: 09/27/2021
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.686647
- Longitude: -122.746386
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.7
Water Quality ProjectY (Y/N)
- . . . . C.7.a
Water quality funding 8,050.58
- . . . . C.7.d.1
Refuse/debris removalY (Y/N)
- . . . . . . C.7.d.2
Pounds (lbs) of trash collected6000 (lbs)
BPA - BPA_2003-012-00_74314 REL 114-ws-571405: F: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571405: F: 198. Maintain Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
Maintain Planted Trees and Shrubs, Reiger oak site
Additional Detail
Work Statement Element 155346:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155346
Tree mats and tubes placed on tree and shrubs as necessary, watering and mowing between plants to reduce competition and improve plant growth and survival. May also include the replacement of individual trees or shrubs if mortality exceeds acceptable levels. Areas maintained include Reiger, McBride, Lake River, Buckmire, and Old Ag Field oak planting sites as well as areas where initial planting is not yet completed listed as other work elements in this statement of work.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.688888
- Longitude: -122.743364
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 754.74
- . . . . C.4.g.1
Plant removal/controlY (Y/N)
- . . . . . . C.4.g.3
Miles of stream treated for plant removal/control .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 754.74
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 25.0
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control 2.00
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 754.74
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 55.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571414: M: 47. Plant Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571414: M: 47. Plant Vegetation
- Start Date: 10/01/2020
- End Date: 02/18/2021
Area Description
SOUTH UNIT (old rookery site)-- Plant Trees, Old Rookery Site
Additional Detail
Work Statement Element 155352:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155352
Plant trees as needed to maintain this site as a viable nest site for Great Blue Herons and maintain long-term HU values.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.687272
- Longitude: -122.75909
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 2,012.65
- . . . . C.6.f.1
Planting for erosion and sediment controlY (Y/N)
- . . . . . . C.6.f.3
Acres planted for erosion and sediment control 5.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571417: P: 47. Plant Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571417: P: 47. Plant Vegetation
- Start Date: 10/01/2020
- End Date: 02/18/2021
Area Description
CHAPMAN SLOUGH-- Riparian Planting, Old Slough site
Additional Detail
Work Statement Element 155355:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155355
Plant trees and shrubs in an 5 acre riparian zone along the historic slough (crevasse splay feature) that once connected the Shillapoo lakebed to the Columbia River, to achieve desired habitat characteristics. The initial planting has been completed, however replanting will occur for several years to replace trees and shrubs that did not survive. Prior site preparation is an ongoing process and still needed in some areas prior to planting.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.706849
- Longitude: -122.740763
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 7,044.26
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.3
Acres planted in riparian 5.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571407: F: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571407: F: 198. Maintain Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
Maintain Planted Trees and Shrubs, Lake River enhancement site
Additional Detail
Work Statement Element 155346:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155346
Tree mats and tubes placed on tree and shrubs as necessary, watering and mowing between plants to reduce competition and improve plant growth and survival. May also include the replacement of individual trees or shrubs if mortality exceeds acceptable levels. Areas maintained include Reiger, McBride, Lake River, Buckmire, and Old Ag Field oak planting sites as well as areas where initial planting is not yet completed listed as other work elements in this statement of work.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.717139
- Longitude: -122.730229
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
BPA - BPA_2003-012-00_74314 REL 114-ws-571411: J: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571411: J: 199. Remove Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
BUCKMIRE SLOUGH--Site Prep/Clearing, Buckmire Slough Site
Additional Detail
Work Statement Element 155349:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155349
Clear area for future restoration plantings. Work has occurred since FY2007 but a substantial amount of work remains. Scheduling has been difficult due to sensitive wildlife sites (heron rookeries and Bald Eagle nesting site) and availability of contractors at the right time.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.685814
- Longitude: -122.749718
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 18,113.81
- . . . . C.4.g.1
Plant removal/controlY (Y/N)
- . . . . . . C.4.g.3
Miles of stream treated for plant removal/control .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 18,113.81
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 5.0
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control .00
BPA - BPA_2003-012-00_74314 REL 114-ws-571410: I: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571410: I: 199. Remove Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.691854
- Longitude: -122.744607
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 19,455.57
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 40.0
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control 2.00
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 19,455.57
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 600.0
- . . C.9
Estuarine/Nearshore ProjectY (Y/N)
- . . . . C.9.a
Estuarine/nearshore funding 19,455.57
- . . . . C.9.j.1
Estuarine plant removal/controlY (Y/N)
- . . . . . . C.9.j.3
Acres of estuary treated 20.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571413: L: 47. Plant Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571413: L: 47. Plant Vegetation
- Start Date: 10/01/2020
- End Date: 02/18/2021
Area Description
NORTH UNIT (old ag site)-- Plant Oak habitat, North Unit Oak Site
Additional Detail
Work Statement Element 155351:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155351
Continue oak habitat planting within a 26 acre abandoned agricultural field near Lake River within the North Unit. Planting began in FY08 but will need to continue, approximately until FY22.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.720343
- Longitude: -122.735848
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 5,031.61
- . . . . C.6.f.1
Planting for erosion and sediment controlY (Y/N)
- . . . . . . C.6.f.3
Acres planted for erosion and sediment control 5.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571406: F: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571406: F: 198. Maintain Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
Maintain Planted Trees and Shrubs, McBride oak site
Additional Detail
Work Statement Element 155346:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155346
Tree mats and tubes placed on tree and shrubs as necessary, watering and mowing between plants to reduce competition and improve plant growth and survival. May also include the replacement of individual trees or shrubs if mortality exceeds acceptable levels. Areas maintained include Reiger, McBride, Lake River, Buckmire, and Old Ag Field oak planting sites as well as areas where initial planting is not yet completed listed as other work elements in this statement of work.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.704878
- Longitude: -122.7549
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
BPA - BPA_2003-012-00_74314 REL 114-ws-571408: F: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571408: F: 198. Maintain Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
Maintain Planted Trees and Shrubs, Old Ag Field Oak Site
Additional Detail
Work Statement Element 155346:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155346
Tree mats and tubes placed on tree and shrubs as necessary, watering and mowing between plants to reduce competition and improve plant growth and survival. May also include the replacement of individual trees or shrubs if mortality exceeds acceptable levels. Areas maintained include Reiger, McBride, Lake River, Buckmire, and Old Ag Field oak planting sites as well as areas where initial planting is not yet completed listed as other work elements in this statement of work.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.71757
- Longitude: -122.736214
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
BPA - BPA_2003-012-00_74314 REL 114-ws-571403: D: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571403: D: 199. Remove Vegetation
- Start Date: 10/01/2020
- End Date: 05/14/2021
Area Description
Rehabilitate or Overseed Pasture, Vancouver Lake Field
Additional Detail
Work Statement Element 155344:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155344
Rehabilitate or overseed approximately 35 acres of pasture. Seed may be broadcast to supplement existing stands or full rehab including spraying stands and tilling soils prior to planting. Planting of cover crops to control weeds may also be implemented one or two years in advance of replanting the pasture to reduce weed densities and herbicide use, improve the soil conditions, as well as to ensure greater success of the pasture seed germination and establishment.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.658765
- Longitude: -122.713352
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 30,189.68
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 12.0
BPA - BPA_2003-012-00_74314 REL 114-ws-571404: E: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2003-012-00_74314 REL 114-ws-571404: E: 198. Maintain Vegetation
- Start Date: 10/01/2020
- End Date: 09/27/2021
Area Description
Goose Forage Management, center point
Additional Detail
Work Statement Element 155345:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/155345
Mow pasture or reed canary grass to reduce height and facilitate regrowth and a condition reflecting optimum habitat value. This occurs primarily in areas that are not included in grazing leases where the leasee is required to do this work. May also include harrowing, liming or fertilizing of pastures and planting of cover crops if required to produce best conditions and/or funding is available for materials.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.691854
- Longitude: -122.744607
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 28,177.03
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 25.0
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control 2.00
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 28,177.03
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 500.0
|
|