Project 2011-004-00:ODFW Operation & Maintenance (O&M), Contract 74313 REL 77:2011-004-00 EXP ODFW OPERATION & MAINTENANCE
Instream Habitat; Riparian Habitat; Upland Habitat And Sediment; Water Quality; Wetland
|
BPA_2011-004-00_74313 REL 77 | - | 07/01/2020 | 06/30/2021 | Completed | 11/10/2021 | |
| |
Description
Project 2011-004-00:
https://www.cbfish.org/Project.mvc/Display/2011-004-00
This project will provide the funding necessary for ODFW to implement the Willamette Wildlife MOA between BPA and the State of Oregon and to assist with restoration and/or operations and maintenance work that is required on acquisitions funded through the MOA and those that were accomplished prior to the MOA.
Contract 74313 REL 77:
https://www.cbfish.org/Contract.mvc/Summary/74313 REL 77
In 2010, the State of Oregon and Bonneville Power Administration (BPA) entered into a fifteen year agreement to permanently settle wildlife mitigation responsibilities for the federal Willamette River Basin Flood Control and Hydroelectric Project in the Willamette subbasin. The Willamette Project includes 13 multi-purpose dams and reservoirs as part of the Federal Columbia River Power System. The Parties to the Willamette River Basin Memorandum of Agreement Regarding Wildlife Protection and Enhancement (MOA) determined that settlement would be accomplished through the protection of an agreed number of acres that, once protected, would permanently settle the federal mitigation requirement. BPA agreed to provide specific funding amounts for the purchase of lands in fee title or conservation easement, as well as the protection and maintenance of this acreage. These annual budgets reflect the agreed upon yearly amounts of funding for the operations and maintenance of the WWMP by ODFW. Since 2010 ODFW had an annual PISCES entry and a contract and every year the budget grows as staff are added and the program begins running at full capacity.
Worksites
BPA - BPA_2011-004-00_74313 REL 77-ws-566251: P: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566251: P: 199. Remove Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
GAWA: Remove vegetation at Gail Achterman Wildlife Area, Gail Achterman Wildlife Area
Additional Detail
Work Statement Element 152953:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152953
ODFW acquired Gail Achterman Wildlife Area, formerly known as Hayden Island, in May 2016. The site totals 290.6 acres, of which approximately 252.1ac are non-wetland riparian floodplain forest, 8.2ac non-wetland floodplain forest opening, 23.8ac are back channel and slough wetland habitats, and 6.5ac are riparian wetland. A portion of the interior has been disturbed through previous gravel mining activities and consists of a mix of native and non-native grasses and forbs. This area is subject to natural recolonization but the non-native plants will be treated through mechanical and chemical methods. The floodplain forest is largely intact with areas consisting of healthy populations of native shrubs, forbs, sedges, and grasses. However, weedy species such as blackberry, reed canary grass, spurge laurel, and english ivy, all state-listed category B weed species, are both ubiquitous throughout the understory. All are designated for targeted control. We will use spraying, mastication, weed whacking, and mowing to remove non native vegetation. The slough is heavily infested with aquatic invasives and is being chemically and mechanically treated.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.9213
- Longitude: -123.112965
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 27,113.55
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 294.0
- . . C.8
Wetland ProjectY (Y/N)
- . . . . C.8.a
Wetland funding 27,113.55
- . . . . C.8.d.1
Wetland plant removal/controlY (Y/N)
- . . . . . . C.8.d.3
Acres of wetland treated 15.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566255: U: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566255: U: 198. Maintain Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
CCS: Maintain, enhance existing vegetation at Coyote Creek South, Coyote Creek South
Additional Detail
Work Statement Element 152957:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152957
ODFW staff will maintain restored wetland prairie areas on Coyote Creek South (CCS) using spot spraying and other mechanized means. Ash removal will also be conducted.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.046667
- Longitude: -123.255556
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 22,231.66
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 15.0
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 22,231.66
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 96.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566269: AG: 47. Plant Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566269: AG: 47. Plant Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
HNA: Plant native vegetation in agricultural area to a prairie conversion in Phase 2 at Herbert Natural Area, Herbert NA
Additional Detail
Work Statement Element 152971:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152971
The contractor, Institute for Applied Ecology, will seed native vegetation in Phase 2 as part of the conversion of agricultural land to wetland prairie. Other activities include project management and coordination with partners and contractors.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.520319
- Longitude: -123.299914
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.f.1
Planting for erosion and sediment controlY (Y/N)
- . . . . . . C.6.f.3
Acres planted for erosion and sediment control 137.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566271: AI: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566271: AI: 199. Remove Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
HNA: Remove nonnative and invasive species at Herbert Natural Area, Herbert NA
Additional Detail
Work Statement Element 152973:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152973
The contractor, Institute for Applied Ecology, will continue with chemical treatment (broadcast treatments, spot spraying, line & circle spraying around trees and shrubs), mowing, hand weeding in Phase I restoration habitats. Contractor will coordinate prescribed burn of upland and wet prairie if conditions allow and will continue Phase II restoration including herbicide treatments, and mowing.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.520319
- Longitude: -123.299914
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 32.0
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 143.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566256: V: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566256: V: 199. Remove Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
CCS: Remove non-native vegetation at Coyote Creek South, Coyote Creek South
Additional Detail
Work Statement Element 152958:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152958
ODFW staff will continue to remove encroaching ash, reed canary grass, shining geranium, English hawthorn, and other non-natives from the "back" of the Coyote Creek South site (199 acres). Work will include spraying herbicides, mowing, mechanical removal, and grinding brush with a skid steer attachment.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.046667
- Longitude: -123.255556
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.g.1
Plant removal/controlY (Y/N)
- . . . . . . C.4.g.3
Miles of stream treated for plant removal/control .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 5.0
- . . . . . . C.5.h.4
Miles of streambank treated for riparian plant removal/control .00
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 174.0
- . . C.8
Wetland ProjectY (Y/N)
- . . . . C.8.d.1
Wetland plant removal/controlY (Y/N)
- . . . . . . C.8.d.3
Acres of wetland treated 20.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566257: W: 181. Create, Restore, and/or Enhance Wetland
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566257: W: 181. Create, Restore, and/or Enhance Wetland
- Start Date: 07/01/2020
- End Date: 11/30/2020
Area Description
CCS: Improve wetland cell infrastructure and restore wetlands to natural function at Coyote Creek South, Coyote Creek South
Additional Detail
Work Statement Element 152959:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152959
The goal of the project is to restore natural wetland function by replacing the water control structures within existing wetland cell units with controllable structures rather than berms and dikes which have been used in the past (this work is in design/permitting/planning phase). Project is in coordination with Ducks Unlimited and uses partial NAWCA funding. Water rights have been secured for the site. Archaeological consultation occurred in FY18. Disking of cells is anticipated to start by July 1 through October 15; vegetation management will continue on this area to eradicate non native vegetation. Areas of the site will be seeded and planted with native vegetation.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.046667
- Longitude: -123.255556
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.8
Wetland ProjectY (Y/N)
- . . . . C.8.e.1
Wetland improvement/restorationY (Y/N)
- . . . . . . C.8.e.2
Acres of wetland treated 24.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566252: Q: 27. Remove Debris
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566252: Q: 27. Remove Debris
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
GAWA: Remove debris from Gail Achterman Wildlife Area deposited from annual flooding and visitors., Gail Achterman Wildlife Area
Additional Detail
Work Statement Element 152954:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152954
Remove garbage and other debris from GAWA deposited from annual flooding and visitors.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.9213
- Longitude: -123.112965
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.7
Water Quality ProjectY (Y/N)
- . . . . C.7.a
Water quality funding 18,495.92
- . . . . C.7.d.1
Refuse/debris removalY (Y/N)
- . . . . . . C.7.d.2
Pounds (lbs) of trash collected300 (lbs)
BPA - BPA_2011-004-00_74313 REL 77-ws-566258: X: 47. Plant Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566258: X: 47. Plant Vegetation
- Start Date: 07/01/2020
- End Date: 04/15/2021
Area Description
CCS: Plant native vegetation at Coyote Creek South, Coyote Creek South
Additional Detail
Work Statement Element 152960:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152960
Plant native vegetation on 40 acres of property, including parts of the newly restored wetland at CCS. This work is new planting that includes the area outside the new wetland cells (work undertaken in WE: W of this contract). Seed drilling is planned in Fall and planting containerized stock (4 inch plugs) in February, with NW Youth Corps and ODFW staff. This is the first year of planting for this particular unit. Work may include a need for archaeological survey.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.046667
- Longitude: -123.255556
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.f.1
Planting for erosion and sediment controlY (Y/N)
- . . . . . . C.6.f.3
Acres planted for erosion and sediment control 116.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566263: AC: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566263: AC: 199. Remove Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
CCNE: Remove vegetation at Coyote Creek NE, Coyote Creek NE
Additional Detail
Work Statement Element 152965:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152965
ODFW staff will remove non native vegetation on Coyote Creek NE. A combination of mowing, spraying, cutting ash saplings, and spot spraying will be employed. Contractors and volunteers may also assist with this activity. This is year 2 of treatment on 12 acres. This will be year 1 on 80 acres (Field 3). Field 4 (132 acres) is still in active agriculture and will not be treated this year. Work may include a need for archaeological survey.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.042201
- Longitude: -123.250734
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 125.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566250: O: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566250: O: 198. Maintain Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
GAWA: Maintain native vegetation at Gail Achterman Wildlife Area, Gail Achterman Wildlife Area
Additional Detail
Work Statement Element 152952:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152952
ODFW staff will maintain and encourage existing native vegetation by treating non-native and invasive plant species. Methods used will include mechanical and chemical. This is led by ODFW staff, with help from volunteers and contractors.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 44.9213
- Longitude: -123.112965
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 45,981.44
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 268.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566273: AK: 27. Remove Debris
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566273: AK: 27. Remove Debris
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
PWA: Remove debris on Palensky Wildlife Area, debris removal
Additional Detail
Work Statement Element 152975:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152975
ODFW staff will remove and dispose of debris that is dumped on site from trespassers and floods. If we are able to obtain the identities of those responsible for the dumping, reports will be made to Multnomah County Sheriff for possible citations/fines, etc. Hazardous materials would be reported to authorities (state police/Multnomah County Sheriff) and DEQ for cleanup. Flood deposited materials are collected and thrown away.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.6523
- Longitude: -122.8439
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.7
Water Quality ProjectY (Y/N)
- . . . . C.7.d.1
Refuse/debris removalY (Y/N)
- . . . . . . C.7.d.2
Pounds (lbs) of trash collected350 (lbs)
BPA - BPA_2011-004-00_74313 REL 77-ws-566278: AO: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566278: AO: 199. Remove Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
FE: Remove invasive non-native vegetation at Flight's End, noxious weed removal
Additional Detail
Work Statement Element 152979:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152979
ODFW staff will develop detailed work plans that will include where and when non-native vegetation removal will occur, and then will remove targeted vegetation using herbicides and mechanized forms of removal. Contract crews may assist with this labor.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.6523
- Longitude: -122.8439
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.g.1
Plant removal/controlY (Y/N)
- . . . . . . C.4.g.4
Acres of streambed treated for plant removal/control 70.0
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 10.0
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 70.0
BPA - BPA_2011-004-00_74313 REL 77-ws-566277: AN: 199. Remove Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-566277: AN: 199. Remove Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
PWA: Remove invasive, non-native vegetation at Palensky Wildlife Area, noxious weed removal
Additional Detail
Work Statement Element 152978:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/152978
ODFW staff and contractors will remove invasive, non-native vegetation on the Palensky Wildlife Area. Targeted species include English ivy, Japanese knotweed, reed canary grass. Herbicides and mechanized methods will be utilized.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.6523
- Longitude: -122.8439
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control 35.0
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 100.0
BPA - BPA_2011-004-00_74313 REL 77-ws-584887: AE: 198. Maintain Vegetation
- Worksite Identifier: BPA - BPA_2011-004-00_74313 REL 77-ws-584887: AE: 198. Maintain Vegetation
- Start Date: 07/01/2020
- End Date: 06/30/2021
Area Description
SOR: Maintain existing vegetation at BPA's Sorenson property, Sorenson
Additional Detail
Work Statement Element 154185:
https://www.cbfish.org/WorkStatementElement.mvc/Summary/154185
The contractor, Friends of Buford park, will maintain invasive vegetation within meadow and the under story of reforestation area (16.75 acres). Remove invasive vegetation in 7.75ac remnant forest. Mow patrol routes/fire breaks. Maintain (plant establishment) 5 acre meadow. Contractor will monitor vegetation, and invasive vegetation presence to inform maintenance strategies.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 43.984528
- Longitude: -122.960658
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.h.1
Upland vegetation managementY (Y/N)
- . . . . . . C.6.h.3
Acres treated for upland vegetation management 26.0
|
|