Project 1992-026-01:Grande Ronde Model Watershed, Contract 84585:1992-026-01 EXP LOWER LIMBER JIM RESTORATION PH 2

Instream Habitat; Riparian Habitat

Instream Habitat Riparian Habitat
Project IDBPA_1992-026-01_84585
Recovery Domains -
Start Date03/01/2020
End Date04/30/2021
StatusCompleted
Last Edited11/10/2021
 
1 - 1

Description    


Project 1992-026-01:

https://www.cbfish.org/Project.mvc/Display/1992-026-01



The Grande Ronde Model Watershed Program coordinates watershed planning activities within the Grande Ronde and Imnaha river basins of Oregon. The watershed activities are focused on habitat protection and restoration, and are generally designed to restore and enhance salmon and steelhead resources, encourage and support land and water management, economics, and multiple land uses consistent with sound ecosystem management, and enhance the quality and quantity of river flow.



Contract 84585:

https://www.cbfish.org/Contract.mvc/Summary/84585



Project Map



Worksites

BPA - BPA_1992-026-01_84585-ws-565596: C: 47. Plant Vegetation    


  • Worksite Identifier: BPA - BPA_1992-026-01_84585-ws-565596: C: 47. Plant Vegetation
  • Start Date: 03/01/2020
  • End Date: 11/30/2020
Area Description

Seed and mulch disturbed areas, Lower Limber Jim Project

Additional Detail

Work Statement Element 152457:

https://www.cbfish.org/WorkStatementElement.mvc/Summary/152457



This restoration action was identified collaboratively during the development of the Upper Grande Ronde Atlas within a high priority Tier 2 Subwatershed UGR 18.

Seed and mulch (where applicable) all disturbed areas with native grass/forb mix.

The USFS would complete this task

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.088808
  • Longitude: -118.341722

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 2,200.70
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . . . C.5.c.3 Acres planted in riparian 7.0

BPA - BPA_1992-026-01_84585-ws-565595: B: 29. Increase Aquatic and/or Floodplain Complexity    


  • Worksite Identifier: BPA - BPA_1992-026-01_84585-ws-565595: B: 29. Increase Aquatic and/or Floodplain Complexity
  • Start Date: 03/01/2020
  • End Date: 11/30/2020
Area Description

Large Wood Structure Construction, Lower Limber Jim

Additional Detail

Work Statement Element 152453:

https://www.cbfish.org/WorkStatementElement.mvc/Summary/152453



This restoration action was identified collaboratively during the development of the Upper Grande Ronde Atlas within a high priority Tier 2 Subwatershed UGR 18.

A total of 30 sites and 5 side channels will have wood input. A total of 389 pieces of large woody debris with racking material will be needed for structure construction, side channels and whole tree placement. There are a total of 30 structures within the 30 sites, with 2 different structure types. All of the large wood will be obtained from a closed road, approximately 1 mile from the project area. There will be approximately 72 loads (ten yard loads) of racking material (small wood and limbs) hauled from roadside brushing close to the project area.

A subcontractor would complete this task.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.089041
  • Longitude: -118.340249

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 90,099.58
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .00