Project 2009-012-00:Willamette Bi-Op Habitat Restoration, Contract 86230:2009-012-00 EXP MINTO BROWN ISLAND PHASE 3

Riparian Habitat

Riparian Habitat
Project IDBPA_2009-012-00_86230
Recovery Domains -
Start Date09/28/2020
End Date12/31/2021
StatusCompleted
Last Edited11/10/2021
 
1 - 1

Description    


Project 2009-012-00:

https://www.cbfish.org/Project.mvc/Display/2009-012-00



Through this project, we will develop a habitat restoration program that will assist in implementing RPAs 7.1.2 and 7.1.3 in the Willamette Biological Opinion issued by NOAA Fisheries on July 11th, 2008.



Contract 86230:

https://www.cbfish.org/Contract.mvc/Summary/86230



This restoration project will take place in the Minto Island Anchor Habitat located in, and owned by, the City of Salem. Restoration activities will occur in 48 acres of floodplain adjacent to the Willamette River. The project site is part of the Minto Island Conservation Area at Minto-Brown Island Park.

The Willamette River is in need of high quality floodplain forest; the reduced amount of historic floodplain forest is identified as a limiting factor and threat for Upper Willamette River Chinook Salmon and Steelhead. This project will focus on treating invasive weeds and planting native trees and shrubs to preserve, restore, and enhance 48 acres of floodplain forest.

BPA funds are being used September 2020 - August 2021 for the treatment of invasive weeds with weed eater mowing and backpack herbicide spraying; planting large cottonwood poles by live staking in winter of 2020-2021 with installation by power augers and hand tools carried into the site; and the purchase of native plant materials for installation in the winter of 2021-2022. The actual installation of native plants purchased with BPA funds will be completed using other secured non-BPA funding sources.



Project Map



Worksites

BPA - BPA_2009-012-00_86230-ws-572410: D: 199. Remove Vegetation    


  • Worksite Identifier: BPA - BPA_2009-012-00_86230-ws-572410: D: 199. Remove Vegetation
  • Start Date: 09/28/2020
  • End Date: 08/11/2021
Area Description

Remove invasive vegetation, From Shapefile Import on 6/30/2020 by Zach Diehl WSID_102841

Additional Detail

Work Statement Element 150794:

https://www.cbfish.org/WorkStatementElement.mvc/Summary/150794



Treat 48 acres of invasive vegetation with chemical and mechanical techniques using subcontractors.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 44.93558782759
  • Longitude: -123.057178533238

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 65,554.86
      •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
        •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control 48.0
        •      . . . . . . C.5.h.4 Miles of streambank treated for riparian plant removal/control .00

BPA - BPA_2009-012-00_86230-ws-572452: E: 47. Plant Vegetation    


  • Worksite Identifier: BPA - BPA_2009-012-00_86230-ws-572452: E: 47. Plant Vegetation
  • Start Date: 09/28/2020
  • End Date: 12/28/2020
Area Description

Purchase native plants and install cottonwood stakes, From Shapefile Import on 6/30/2020 by Zach Diehl WSID_102849

Additional Detail

Work Statement Element 150789:

https://www.cbfish.org/WorkStatementElement.mvc/Summary/150789



Purchase of plant materials and installation of cottonwood stakes, using subcontractors for both.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 44.9350134661793
  • Longitude: -123.059554979386

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 1,920.52
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)
        •      . . . . . . C.5.c.3 Acres planted in riparian 6.0