US 101/Unnamed to Columbia River

Fish Passage Improvement

Fish Passage Improvement
Project IDWDOT_135
Recovery Domains -
Start Date -
End Date -
StatusCompleted
Last Edited08/27/2020
 
1 - 1

Description    


Replaced a 2 ft culvert with a 12 ft culvert at an Unnamed Trib to the Columbia River



Project Map



Worksites

WDOT - WDOT_135-ws-1: 1    


  • Worksite Identifier: WDOT - WDOT_135-ws-1: 1
  • Start Date:
  • End Date:
Area Description

3.3

Additional Detail

3.3

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 46.2577248
  • Longitude: -123.9260941

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)