Project # 04.0659 0.31 Aldon Cr fishway

Fish Passage Improvement

Fish Passage Improvement
Project IDWFW_F_71
Recovery DomainsPuget Sound
Start Date -
End Date -
StatusCompleted
Last Edited04/26/2021
 
1 - 1

Description    


This is a 114 ft. long, 12 ft. diameter CST, equipped with a welded steel cutoff plate and graded streambed material and placed on grade. There are six log controls downstream and seven upstream to control regrade and provide fish passage.



Project Map



Worksites

WDFW Fishway - WFW_F_71-ws-1: 1    


  • Worksite Identifier: WDFW Fishway - WFW_F_71-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Puget Sound

Location Information

  • Basin: 171100
  • Subbasin: 17110005
  • Watershed: 1711000507
  • Subwatershed: 171100050704
  • State: Washington
  • Recovery Domain: Puget Sound
  • Latitude: 48.490785
  • Longitude: -121.656081

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)