Project # 24.0653 0.01 Alder Cr(Naselle) fishway

Fish Passage Improvement

Fish Passage Improvement
Project IDWFW_F_469
Recovery Domains -
Start Date -
End Date -
StatusCompleted
Last Edited04/26/2021
 
1 - 1

Description    


A three step weir-pool fishway with concrete weirs attached to a rock chute blasted through the left bank side of a natural cascades. The weirs slope to the center for low flow passage.



Project Map



Worksites

WDFW Fishway - WFW_F_469-ws-1: 1    


  • Worksite Identifier: WDFW Fishway - WFW_F_469-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Washington Coastal

Location Information

  • Basin: 171001
  • Subbasin: 17100106
  • Watershed: 1710010601
  • Subwatershed: 171001060101
  • State: Washington
  • Recovery Domain:
  • Latitude: 46.489164
  • Longitude: -123.646936

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)