Project # 15.0056 0.20 Burley Cr fishway Fish Passage Improvement Project IDWFW_F_335Recovery DomainsPuget SoundStart Date - End Date - StatusCompletedLast Edited04/26/2021 1 - 1 Description A two barrel concrete box culvert with 2 inverted angle steel baffles in the right side, a full length apron lip baffle, and a deflection baffle at the intake of the left side. Two rock controls downstream.