This project was identified as ITD mitigation for U.S. Highway 95 Slide Repair (MP 210.5). ITD has completed necessary NEPA, however, updated BLM EA will tier to existing ITD EA and Section 7 Consultation (Endangered Species Act). The project includes partial recontouring of the Lucile Bar pond. Suitable riparian and wetland species will be planted adjacent to the pond. Upland plantings and seedings will also take place around the pond and on the Lucile Bar. The project is a cooperative effort with ITD.