South Fork of the Coeur d'Alene River Restoration Pilot

Instream Habitat

Instream Habitat
Project IDNRRSS_2256
Recovery Domains -
Start Date -
End Date -
StatusCompleted
Last Edited04/26/2021
 
1 - 1

Description    


The emphasis of the project was on natural channel design with the use of stable nodes and limited bank stabilization recognizing the fact that the reach is located in the middle of a highly impacted system. Website: www.tgenviro.com/water_sfcda.asp



Project Map



Worksites

NRRSS - NRRSS_2256-ws-1: 1    


  • Worksite Identifier: NRRSS - NRRSS_2256-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Spokane

Location Information

  • Basin: 170103
  • Subbasin: 17010302
  • Watershed: 1701030202
  • Subwatershed: 170103020203
  • State: Idaho
  • Recovery Domain:
  • Latitude: 47.559447
  • Longitude: -116.248902

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)