Commencement Bay NRDA Restoration - Mowitch Restoration Project

Estuarine/Nearshore; Instream Habitat; Upland Habitat And Sediment

Instream Habitat Upland Habitat And Sediment
Project IDNOAA_388
Recovery Domains -
Start Date07/05/2001
End Date09/30/2001
StatusCompleted
Last Edited04/26/2021
 
1 - 1

Description    


This project enhanced and elarged the estuarine creek mouth along the eastern bank of Hylebos Creek where it meets Hylebos Waterway. An abandoned industrial site was excavated to create a series of backwater sloughs and marsh benches edged by an upland b



Worksites

NOAA Restoration - NOAA_388-ws-1: 1    


  • Worksite Identifier: NOAA Restoration - NOAA_388-ws-1: 1
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude:
  • Longitude:

ESU

    No ESU data was found for this worksite.

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.f.1 Planting for erosion and sediment controlY (Y/N)
        •      . . C.9 Estuarine/Nearshore ProjectY (Y/N)
          •      . . . . C.9.g.1 Removal of existing fill materialY (Y/N)