H17 Drain (Contract # S029)

Upland Habitat And Sediment

Upland Habitat And Sediment
Project IDIDEQ_23
Recovery Domains -
Start Date -
End Date -
StatusCompleted
Last Edited04/26/2021
 
1 - 1

Description    


Sediment basin installed at the bottom end of a six-mile long irrigation canal. The basin is 200 feet long and 50 feet wide. This facility captures sediment from return irrigation water prior to discharge to Goose Creek and Snake River.



Project Map



Worksites

IDAHODEQ - IDEQ_23-ws-1: 1    


  • Worksite Identifier: IDAHODEQ - IDEQ_23-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Upper Snake

Location Information

  • Basin: 170402
  • Subbasin: 17040212
  • Watershed: 1704021205
  • Subwatershed:
  • State: Idaho
  • Recovery Domain:
  • Latitude: 42.5301
  • Longitude: -114.4111

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.e.1 Erosion control structures installedY (Y/N)