B. Salmon (Houck) Creek Sediment Abatement

Upland Habitat And Sediment

Upland Habitat And Sediment
Project IDHWS_7256
Recovery DomainsPuget Sound
Start Date08/01/2002
End Date09/30/2002
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


A tributary to lower Salmon Creek was diverted out of its original location through the lower valley and into a small pond and over a steep cliff into middle section of Salmon Creek. This tributary, called Houck Creek, was creating significant amounts of



Project Map



Worksites

HWS - HWS_7256-ws-1: Houck Creek Sediment Abatement 1    


  • Worksite Identifier: HWS - HWS_7256-ws-1: Houck Creek Sediment Abatement 1
  • Start Date:
  • End Date:
Area Description

PUGET SOUND

Location Information

  • Basin: 171100
  • Subbasin: 17110020
  • Watershed: 1711002001
  • Subwatershed: 171100200101
  • State: WA
  • Recovery Domain: Puget Sound
  • Latitude: 47.978344179
  • Longitude: -122.90190807

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.e.1 Erosion control structures installedY (Y/N)
        •      . . . . . . C.6.e.3 Erosion / sediment control installations 1