Skokomish Estuary Restoration Phase 2- Nalley Island

Estuarine/Nearshore; Instream Habitat

Instream Habitat
Project IDHWS_13405
Recovery DomainsPuget Sound
Start Date05/02/2003
End Date12/20/2011
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


This project represents Phase Two of the Skokomish River Estuary Restoration, which will restore natural estuarine functions by removal of agricultural dikes and seawall. This project will focus on the Skokomish River's lower island referred to locall



Project Map



Worksites

HWS - HWS_13405-ws-1: Skokomish Estuary Restoration (Nalley Island)- Pha 1    


  • Worksite Identifier: HWS - HWS_13405-ws-1: Skokomish Estuary Restoration (Nalley Island)- Pha 1
  • Start Date:
  • End Date:
Area Description

PUGET SOUND

Location Information

  • Basin: 171100
  • Subbasin: 17110018
  • Watershed: 1711001701
  • Subwatershed: 171100170106
  • State: WA
  • Recovery Domain: Puget Sound
  • Latitude: 47.33807
  • Longitude: -123.1252

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity 3,600.00
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity 214.0
      •      . . C.9 Estuarine/Nearshore ProjectY (Y/N)
        •      . . . . C.9.d.1 Dike or berm modification/removalY (Y/N)
          •      . . . . . . C.9.d.2 Miles of dike(s) removed/modified 3,600.00
          •      . . . . . . C.9.d.3 Acres of habitat made available to salmonids 214.0