Chewuch Dam Modification

Fish Passage Improvement

Fish Passage Improvement
Project IDHWS_13317
Recovery DomainsInterior Columbia
Start Date01/01/2005
End Date06/30/2009
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


The Chewuch Canal relies on a concrete dam at RM 8.0 on the Chewuch River. In 2005, using a Bureau of Reclamation design, the Chewuch Canal Company rebuilt the early 20th century diversion dam to improve fish passage and irrigation reliability. The full



Project Map



Worksites

HWS - HWS_13317-ws-1: Chewuch Diversion Modification 1    


  • Worksite Identifier: HWS - HWS_13317-ws-1: Chewuch Diversion Modification 1
  • Start Date:
  • End Date:
Area Description

UPPER COLUMBIA

Location Information

  • Basin: 170200
  • Subbasin: 17020008
  • Watershed: 1702000804
  • Subwatershed: 170200080408
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 48.509464817
  • Longitude: -120.184957067

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.d.1 Fishway chutes or pools installedY (Y/N)