Dry Fork Large Woody Material Placement

Fish Passage Improvement; Instream Flow

Fish Passage Improvement Instream Flow
Project IDTF_134
Recovery DomainsInterior Columbia
Start Date -
End Date -
StatusCompleted
Last Edited04/26/2021
 
1 - 1

Description    


In-Channel Restoration 3 miles. Historic push-up diversion dam was replaced with a pump station. This system will improve irrigation efficiency and discontinue the need for yearly in-stream mining of berm material.



Project Map



Worksites

Fisher Fisheries - TF_134-ws-1: 1    


  • Worksite Identifier: Fisher Fisheries - TF_134-ws-1: 1
  • Start Date:
  • End Date:
Area Description

John Day

Location Information

  • Basin: 170702
  • Subbasin: 17070203
  • Watershed: 1707020301
  • Subwatershed: 170702030103
  • State: Oregon
  • Recovery Domain: Interior Columbia
  • Latitude: 44.575866
  • Longitude: -118.48879

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
      •      . . C.3 Instream Flow ProjectY (Y/N)
        •      . . . . C.3.e.1 Irrigation practice improvementY (Y/N)