YAKAMA NATION, WANITY SLOUGH RESTORATION

Project IDUS-WA-22-10
Recovery DomainsInterior Columbia
Start Date11/05/2001
End Date02/07/2002
StatusCompleted
Last Edited08/27/2020
 
1 - 1

Description    


Survey, design and construct several low dikes and water control structures in Wanity Slough which is a tributary of Toppenish Creek. Water is supplied by an existing solar powered pump. This project is included in DY/YN MOA dated 2/28/01. , ENHANCE RIPARIAN UPLAND , RESTORE EMERGENT WETLAND



Project Map



Worksites

Ducks Unlimited - US-WA-22-10-ws-1: 1    


  • Worksite Identifier: Ducks Unlimited - US-WA-22-10-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Yakima

Location Information

  • Basin: 170300
  • Subbasin: 17030003
  • Watershed: 1703000304
  • Subwatershed: 170300030406
  • State: Washington
  • Recovery Domain: Interior Columbia
  • Latitude: 46.31667
  • Longitude: -120.325

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)