Big Timber Flow Enhancement

Instream Flow

Instream Flow
Project IDBOR_4417
Recovery DomainsInterior Columbia
Start Date05/30/2003
End Date08/15/2009
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


Water rights from BT-2 diversion were transferred to a new POD in the Lemhi River. Instead, BT-2 water remains in the creek channel to the Lemhi River to a location where the water is diverted out of the river and pumped back up to the historic place of



Project Map



Worksites

BOR - BOR_4417-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4417-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170602
  • Subbasin: 17060204
  • Watershed: 1706020405
  • Subwatershed: 170602040503
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 44.70138889
  • Longitude: -113.3822222

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.f.1 Water leased or purchasedY (Y/N)