Knapp Wham Diversion Replacement (Phase 2)

Instream Flow

Instream Flow
Project IDBOR_4391
Recovery DomainsInterior Columbia
Start Date04/16/2009
End Date10/15/2009
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


This project is part of the larger Knapp-Wham/Hanan Detwiler Ditch consolidation. It is the replacement of a push-up dam with a permanent diversion for the KW ditch.



Project Map



Worksites

BOR - BOR_4391-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4391-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170200
  • Subbasin: 17020010
  • Watershed: 1702001002
  • Subwatershed: 170200100209
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 47.695
  • Longitude: -120.3202778

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.e.1 Irrigation practice improvementY (Y/N)