Entiat National Fish Hatchery (ENFH) Habitat Channel (Bridge to Bridge Resoration, Phase 5)

Instream Habitat

Instream Habitat
Project IDBOR_4357
Recovery DomainsInterior Columbia
Start Date01/14/2008
End Date09/30/2010
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


The USFWS and Bureau of Reclamation are collaborating on a multi-faceted project at the ENFH that incorporates existing infrastructure into a new project to provide off-channel spawning and rearing habitat for ESA-listed species



Project Map



Worksites

BOR - BOR_4357-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4357-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170200
  • Subbasin: 17020010
  • Watershed: 1702001002
  • Subwatershed: 170200100209
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 47.6975
  • Longitude: -120.3216667

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)