Milne Diversion Project ( Bridge to Bridge and Beyond Project # 1)

Fish Passage Improvement

Fish Passage Improvement
Project IDBOR_4340
Recovery DomainsInterior Columbia
Start Date08/25/2006
End Date10/15/2007
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


This is the first project in the Lower Entiat resulting from TSCs Reach Study. It will be multiple instream habitat structures including one that also replaces an irrigation push-up dam.



Project Map



Worksites

BOR - BOR_4340-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4340-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170200
  • Subbasin: 17020010
  • Watershed: 1702001002
  • Subwatershed: 170200100209
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 47.66583333
  • Longitude: -120.2766667

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)