Below the Bridge (Moody Canyon) ELJ (Bridge to Bridge Resoration, Phase 4)

Instream Habitat

Instream Habitat
Project IDBOR_4339
Recovery DomainsInterior Columbia
Start Date04/01/2007
End Date01/15/2009
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


Complexity Project in the lower Entiat



Project Map



Worksites

BOR - BOR_4339-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4339-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170200
  • Subbasin: 17020010
  • Watershed: 1702001002
  • Subwatershed: 170200100209
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 47.66416667
  • Longitude: -120.2633333

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)