Below the Bridge (Moody Canyon) ELJ (Bridge to Bridge Resoration, Phase 4)
Instream Habitat
|
BOR_4339 | Interior Columbia | 04/01/2007 | 01/15/2009 | Completed | 12/09/2014 | |
| |
Description
Complexity Project in the lower Entiat
Worksites
BOR - BOR_4339-ws-1: 1
- Worksite Identifier: BOR - BOR_4339-ws-1: 1
- Start Date:
- End Date:
Location Information
- Basin: 170200
- Subbasin: 17020010
- Watershed: 1702001002
- Subwatershed: 170200100209
- State: WA
- Recovery Domain: Interior Columbia
- Latitude: 47.66416667
- Longitude: -120.2633333
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
|
|