CMZ 12/13

Instream Habitat

Instream Habitat
Project IDBOR_4315
Recovery DomainsInterior Columbia
Start Date02/26/2008
End Date10/15/2008
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


Channel Reconfiguration



Project Map



Worksites

BOR - BOR_4315-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4315-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170200
  • Subbasin: 17020011
  • Watershed: 1702001107
  • Subwatershed: 170200110707
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 47.53361111
  • Longitude: -120.5486111

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)