Three Mission Creek Projects: Miller, Turnbull and Jurgins

Instream Habitat

Instream Habitat
Project IDBOR_4284_6
Recovery DomainsInterior Columbia
Start Date06/26/2006
End Date10/15/2006
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


Miller and Turnbull- Repair and installation of low stage log weirs to re-establish plunge pool habitat and thalweg, and increase complexity.

Jurgins- Install a low stage rock weir with large woody debris to provide plunge pool habitat, control bank eros



Project Map



Worksites

BOR - BOR_4284_6-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4284_6-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170200
  • Subbasin: 17020011
  • Watershed: 1702001106
  • Subwatershed: 170200110604
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 47.45722222
  • Longitude: -120.4908333

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)