Libby-Hansler Diversion Replacement

Instream Flow

Instream Flow
Project IDBOR_4269
Recovery DomainsInterior Columbia
Start Date06/17/2005
End Date07/20/2005
StatusCompleted
Last Edited12/09/2014
 
1 - 1

Description    


The objective of the project is for Reclamation to provide technical assistance to the landowners in assessing technical feasibility and funding sources for replacing the current diversion/screen/ditch system with groundwater wells.



Project Map



Worksites

BOR - BOR_4269-ws-1: 1    


  • Worksite Identifier: BOR - BOR_4269-ws-1: 1
  • Start Date:
  • End Date:
Area Description

Location Information

  • Basin: 170200
  • Subbasin: 17020008
  • Watershed: 1702000805
  • Subwatershed: 170200080509
  • State: WA
  • Recovery Domain: Interior Columbia
  • Latitude: 48.36833333
  • Longitude: -120.3216667

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.e.1 Irrigation practice improvementY (Y/N)