Klamath River Flow Study Activities Support 2008

Salmonid Research, Monitoring, and Evaluation (RM&E)

Monitoring
Project ID32008
Recovery DomainsN CA - S Oregon
Start Date03/04/2009
End Date06/02/2009
Year2008
StatusCompleted
Last Edited10/05/2026
 
1 - 1

Description    


The Karuk Fisheries Program assisted the US Fish and Wildlife Service and US Geologic Survey with Flow Study efforts on going on the mainstem Klamath River. These efforts included outmigrant fish trapping and sampling in the river reaches downstream of Iron Gate Dam to the confluence of the Scott River. Data will assist development of the fish production model SALMOD, development of habitat suitability curves and determining fish health and viability of juveniles. Information gathered during this study is intended to assist with mainstem Klamath River flow recommendations and water management issues.

Project Benefit    


Data will assist development of the fish production model SALMOD, development of habitat suitability curves and determing fish health and viability of juveniles and is intended to assist with mainsem Klamath River flow recommendations and water management issues.

Accomplishments

Metric Completed Originally
Proposed
Research and Monitoring
  Stream Miles Monitored 50.00 50.00

Funding Details

SourceFunds
PCSRF$30,000
Report Total:$30,000


Project Map



Worksites

33070684    


  • Worksite Identifier: 33070684
  • Start Date: 10/01/2008
  • End Date: 09/30/2010
Area Description
Scot River

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin: Smith River
  • Watershed: Middle Fork Smith River
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.882854
  • Longitude: -123.877716

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • E.0 Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
    •      . . E.0.a RM&E Funding 30,000.00
    •      . . E.0.b
      Complement habitat restoration project
      none
    •      . . E.0.c
      Project identified in a plan or watershed assessment.
      none
    •      . . E.0.d.1 Number of Cooperating Organizations 2
    •      . . E.0.d.2
      Name Of Cooperating Organizations.
      US Fish and Wildlife Services, U.S. Geologic Survey
    •      . . E.0.e.1 Number of reports prepared 0
    •      . . E.0.e.2
      Name Of Report
      none
    •      . . E.1 MonitoringY (Y/N)
      •      . . . . E.1.a Monitoring funding 30,000.00
      •      . . . . E.1.b.1 Stream Miles Monitored 50.00
      •      . . . . E.1.b.2 Acres of Watershed Area Monitored 500.0
      •      . . . . E.1.c.8 Water quality monitoringY (Y/N)
        •      . . . . . . E.1.c.8.a # miles (to nearest 0.01 mile) of stream monitored for water quality 50.00
      •      . . . . E.1.c.9 Water quantity (flow) monitoringY (Y/N)
        •      . . . . . . E.1.c.9.a # miles (to nearest 0.01 mile) monitored for water quantity (flow) monitoring 50.00
        •      . . . . E.1.d
          Name Of Comprehensive Monitoring Strategy/Program
          none