| 057 05 SA | | Snake River | | 03/18/2009 | | 11/30/2009 | | 2005 | | Completed | | 01/14/2025 | | |
| |
Description
The project sponsor took delivery of the of the boat and trailer designed for monitoring and evaluation, to meet objectives of the Redfish Lake Sockeye Captive Broodstock Program. The boat and trailer are being used to transport eggs and fish to release location in three Stanley Basin lakes, retrieve in-lake incubation devices after eggs have been hatched and fry emerge, and conduct routine biological assessment such as limnological surveys, habitat surveys, telemetry surveys, adult spawner surveys and angler creel surveys. All objectives address slated program objectives.
Project Benefit
The acquisition of a watercraft meeting program specification will an immediate benefit to ESA-listed Snake River sockeye salmon by providing program-critical monitoring and evaluation components.
Accomplishments
| Research and Monitoring |
| Stream Miles Monitored |
710.00 |
710.00 |
Funding Details |
| PCSRF | $57,007 |
| State | $40,328 |
| Report Total: | $97,335 |
|
| |
Worksites
Sawtooth Basin -SR Sockeye Sal
- Worksite Identifier: Sawtooth Basin -SR Sockeye Sal
- Start Date: 04/01/2009
- End Date: 08/31/2009
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Salmon (170602)
- Subbasin: Upper Salmon (17060201)
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 44.108567
- Longitude: -114.933511
ESU
- Snake River Sockeye Salmon ESU
Map
Photos
Metrics
Metrics
- E.0
Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
- . . E.0.a
RM&E Funding 97,335.00
- . . E.0.b
| Complement habitat restoration project | |
| none |
- . . E.0.c
| Project identified in a plan or watershed assessment. | |
| Northwest Power and Conservation Council. 2005. "Salmon Subbasin Management Plan." In Columbia River Basin Fish and Wildlife Program. Portland, Oregon. |
- . . E.0.d.1
Number of Cooperating Organizations 4
- . . E.0.d.2
| Name Of Cooperating Organizations. | |
| Bonneville Power Administration, Idaho Department of Fish and Game, Shoshone-Bannock Tribes of Idaho, National Oceanic and Atmospheric Administration-Fisheries Division |
- . . E.0.e.1
Number of reports prepared 2
- . . E.0.e.2
| Name Of Report | |
| Heindel, June 30, 2009, Quarterly Progress Report to OSC, IDFG, Boise, Idaho.
Heindel, August 31, 2009, Final Progress Report to OSC, IDFG, Boise, Idaho. |
- . . E.1
MonitoringY (Y/N)
- . . . . E.1.a
Monitoring funding 97,335.00
- . . . . E.1.b.1
Stream Miles Monitored 710.00
- . . . . E.1.b.2
Acres of Watershed Area Monitored 2,750.0
- . . . . E.1.c.1
Adult salmonid population monitoringY (Y/N)
- . . . . . . E.1.c.1.a
# miles (to nearest 0.01 mile) monitored for adult salmonids 710.00
- . . . . E.1.d
| Name Of Comprehensive Monitoring Strategy/Program | |
| Heindel, 2009, Snake River Sockeye Salmon Captive Broodstock Program, IDFG, Boise, Idaho. |
- . . . . E.1.e
| Description of monitoring | |
| Research Monitoring and Evaluation guided by FCRPS Biological Opinions RPAs, Action agency requests, BPA/Idaho Accord language as well as Idaho Department of Fish and Game Management Plans, and all actions coordinated by the Stanley Basin Sockeye Technical Oversight Committee. |
|
|