Potlatch River Restoration III
Salmonid Habitat Restoration and Acquisition
|
008 07 CW C3 | Snake River | 05/23/2008 | 06/29/2012 | 2007 | Completed | 01/14/2025 | |
| |
Description
The project was completed as proposed, although the final match costs were slightly higher than originally estimated. The length of abandoned eroded channel was slightly more than originally estimated 7,867 [1.49 miles] versus 7,830 [1.44]. The vegetation survival was enhanced tremendously by supplemental watering. Instream habitat involved bank stabilization through the use of logs, log barbs and vegetation. Riparian treatments included vegetation along 1.1 miles of streambank and fencing to exclude livestock along 1.25 miles of streambank.
Project Benefit
Erosion patterns and riparian degradation in the two Corral Creek project sites will be reduced through implementation of designed riparian restoration practices. Improved stream and riparian function will reduce erosion, sedimentation, and water temperatures, return flow to a natural channel with riparian connectivity thereby increasing stream and riparian habitat complexity. Riparian plantings will increase shading and woody debris recruitment potential. Restoration of meadow/wetlands is expected to reduce peak storm discharges and improve stream flows. Fish passage to upper Corral Creek will be enhanced and steelhead spawning, incubation and early rearing is expected to improve.
Accomplishments
Instream Habitat |
Stream Miles Treated |
2.04 |
2.04 |
Riparian Habitat |
Stream Miles Treated |
1.10 |
1.10 |
Acres Treated |
2.0 |
1.3 |
Funding Details |
PCSRF | $315,839 |
Other | $118,836 |
In-Kind Other | $40,835 |
Report Total: | $475,510 |
|
| |
Worksites
1-Corral CreeK Avulsion Reach
- Worksite Identifier: 1-Corral CreeK Avulsion Reach
- Start Date: 07/15/2008
- End Date: 06/29/2012
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Clearwater (170603)
- Subbasin: Clearwater (17060306)
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 46.81671
- Longitude: -116.478275
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 475,510.00
- . . C.0.b
Length of stream treated/protected 2.04
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Latah SWCD. 2007. Potlatch River Watershed Management Plan. Moscow, Idaho.
NPCC. 2005. Clearwater Subbasin Management Plan. In, Columbia River Basin Fish and Wildlife Program. Portland, Oregon |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.0.d.3
Monitoring text (from Phase I) | |
Photo points will be established and monitoring will occur twice per year for five years. Plant establishment will be evaluated at the same time as will condition of structures. If structural failures are identified by Latah SWCD staff, professional engineering assistance will be requested for maintenance recommendations. Additional water quality monitoring and habitat conditions will be undertaken using adopted protocols with funding secured from BPA and Department of Environmental Quality's 319 program. |
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 308,793.00
- . . . . C.4.b
Total length of instream habitat treated 2.04
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized 1.49
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 166,717.00
- . . . . C.5.b.1
Total riparian miles streambank treated 1.10
- . . . . C.5.b.2
Total Riparian Acres Treated 2.0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Alnus incana, Amelanchier alnifolia, Carex aquatilis, C. exisiccata, C. lenticularis, more C., Cratageus douglasii, Philadelphus lewisii, Physocarpus capitatus, Pinus contorta, P. ponderosa, Populus balsamifera L., P. tremuloides, Prunus virginiana, Salix multiple, Symphoricarpos albus, Achiillea millefolium, Anaphalis margaritacea, Bromus marginatus, Deschampsia, caespitosa, Deschampsia elongata, Eriogonum heracleoides, Festuca idahohensis, Galium boreale, Geum triflorum, Koeleria macrantha, Leymus cinereus, Lomatium dissectum, Lomatium triternatum, Lupinus sericeus, Potentilla arguta, P. gracilis, Pseudoroegneria spicata, Sidalcea oregana, Solidago missouriensis, Symphyotrichum spathulatum, Wyethia amplexicaulis |
- . . . . . . C.5.c.3
Acres planted in riparian 2.0
- . . . . C.5.d.1
FencingY (Y/N)
- . . . . . . C.5.d.2
Miles of fence along stream 1.25
|
|