Phase 2 of Stream Health Characterization Model

Salmonid Research, Monitoring, and Evaluation (RM&E)

Monitoring
Project IDHVT-FY07-Model
Recovery DomainsN CA - S Oregon
Start Date01/01/2009
End Date06/01/2010
Year2007
StatusCompleted
Last Edited10/05/2026
 
1 - 1

Description    


This project included one part-time environmental planner and required the assistance and contributions from both Fisheries and Forestry departments for assessment information. Travel costs associated with this include travel to a PFC assessment training in San Francisco, California and any necessary mileage related to information and data gathering. $3,000 was allocated to contractual for the input of all the PCSRF data into a PFC assessment model by a USEPA contractor. All other costs contributed to any necessary arrangements that needed to be made under the guidelines of the PCSRF.

Project Benefit    


In FY05 TEPA completed the compilation of five years of data from Hoopa Tribal Forestry, Fisheries, HVPUD, and TEPA (Phase I). This information has been pooled into a stream health characterization model which will meet the performance goals and reporting metrics currently being pursued by PCSRF. Aggregation of results from monitoring efforts include fishery out-migrant numbers, flows, suspended sediment results, turbidity and other water quality information, stream habitat assessments and typing, biological and physical data, macro-invertebrate data along with the Index of Biological Integrity (IBI). Phase II of the stream health characterization model will utilize the compilation of the aforementioned monitoring efforts in order to develop a Proper Functioning Condition Assessment (PFC). The purpose of the PFC assessment is designed to assess stream (lotic) and wetland (lentic) riparian systems. The objective of the PFC assessment is to determine what type of management certain systems need compared to the USEPA Bioassessment Protocol.

Because tribes are a land management agency, tribes need to know the integrity of their systems and also know in what direction the system is going, and if there if there is management or no management taking place. The best method for an environmental/ecological monitoring program is to incorporate PFC, water quality and bioassessment protocol, because they are all done on different time scales. Water quality is done monthly to twice per year, bioassessments are done yearly, and PFC is done every 5 years.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$8,121
Report Total:$8,121


Project Map



Worksites

20100381    


  • Worksite Identifier: 20100381
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Klamath (180102)
  • Subbasin: Trinity (18010211)
  • Watershed: Horse Linto Creek-Trinity River
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.08925
  • Longitude: -123.70305

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • E.0 Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
    •      . . E.0.a RM&E Funding 8,121.00
    •      . . E.0.b
      Complement habitat restoration project
      None
    •      . . E.0.c
      Project identified in a plan or watershed assessment.
      None
    •      . . E.0.d.1 Number of Cooperating Organizations 0
    •      . . E.0.d.2
      Name Of Cooperating Organizations.
      None
    •      . . E.0.e.1 Number of reports prepared 0
    •      . . E.0.e.2
      Name Of Report
      None
    •      . . E.1 MonitoringY (Y/N)
      •      . . . . E.1.a Monitoring funding 8,121.00
      •      . . . . E.1.b.1 Stream Miles Monitored .00
      •      . . . . E.1.b.2 Acres of Watershed Area Monitored .0
      •      . . . . E.1.c.9 Water quantity (flow) monitoringY (Y/N)
        •      . . . . . . E.1.c.9.a # miles (to nearest 0.01 mile) monitored for water quantity (flow) monitoring .00
        •      . . . . E.1.d
          Name Of Comprehensive Monitoring Strategy/Program
          None