Acclimation Pond Modification

Salmonid Hatcheries and Harvest Management

Hatchery Production
Project IDCCT 07-4
Recovery Domains -
Start Date10/01/2007
End Date04/01/2008
Year2007
StatusCompleted
Last Edited06/11/2018
 
1 - 1

Description    


The installation of the smooth walled pipe has been successfully implemented. Photos have been taken to document the completion of the project. This project will minimize the potential harm to released Chinook salmon into the Okanogan River.

Project Benefit    


Contribute to increased and sustainable salmon populations by increasing the function and operation of the acclimation pond. This project is part of an overall salmon recovery plan utilizing supplementation.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$37,999
Report Total:$37,999


Worksites

20093594    


  • Worksite Identifier: 20093594
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude:
  • Longitude:

ESU

  • Upper Columbia River Steelhead DPS

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding 37,999.00
    •      . . D.1 Hatchery Production ProjectY (Y/N)
      •      . . . . D.1.a Hatchery Production Funding 37,999.00
      •      . . . . D.1.c.1 Hatchery operations - facility or equipmentY (Y/N)