23 056 41 | N Central California Coast | 06/01/2006 | 10/31/2009 | 2006 | Completed | 01/26/2024 | |
| |
Description
The 2006 (Phase VI) Project reach will consist of approximately 2,750 feet of primary channel development work, and 1,500 feet of side channel modifications and closures. This years work will involve the development of 10 Bio-engineered boulder rip-rap corners, 3 Willow Baffles for bank protection and stabilization and planting approximately 2,000 feet of Willow Walls. Riparian corridor development will entail planting thousands of willows, cottonwoods, alders, poplars, oaks, and other riparian species.
Project Benefit
This years stream restoration effort is the final piece of the stream connection puzzle that connects the two healthy reaches of Mill Creek together that were separated by approximately 2.4 miles of dysfunctional stream habitat. Now the connection is complete and efforts to develop a functional and self-sustaining Riparian Corridor that will serve as the stabilizing force and ecological glue that will hold this project together for years to come!
Accomplishments
Instream Habitat |
Stream Miles Treated |
.25 |
.20 |
Funding Details |
PCSRF | $51,000 |
Report Total: | $51,000 |
|
| |
Worksites
20066391
- Worksite Identifier: 20066391
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed: Mill Creek
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 39.81854
- Longitude: -123.26568
ESU
- California Coastal Chinook Salmon ESU
- Southern Oregon/Northern California Coast Coho Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 51,000.00
- . . C.0.b
Length of stream treated/protected .80
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Round Valley Indian Tribes 1998 Inventory, Monitoring and Assessment of Anadromous Habitats. |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.0.d.3
Monitoring text (from Phase I) | |
Effectiveness monitoring is an ongoing, multi-year event and is conducted in conjunction with the cross sectional and longitudinal profiles slated for this fall, as well as pebble counts |
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 51,000.00
- . . . . C.4.b
Total length of instream habitat treated .25
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .80
|
|