Linn SWCD Support

Public Outreach, Education, and Landowner Recruitment

Outreach / Education
Project IDODA020
Recovery DomainsWillamette River
Start Date07/01/2005
End Date06/30/2007
Year2005
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


Legislative allocations to the Linn Soil and Water Conservation District for conducting outreach and providing technical assistance to landowners interested in doing restoration projects. The types of projects include: CREP implementation, water development, brush management, direct spending, cover crops to control soil erosion, fencing to improve grazing management, riparian fencing, filter strips to control erosion, stream habitat improvements and management, fish passage, irrigation water management, weed management, grazing management, and nutrient management.

Project Benefit    


Benefits achieved include increase landowner knowledge of the relationship between land management, water quality and salmonid survival. Implementation of management actions regarding conservation needs on private lands enhanced watershed condition and salmonid survival

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$62,000
State$35,553
Report Total:$97,553


Project Map



Worksites

20048160    


  • Worksite Identifier: 20048160
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Willamette (170900)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Willamette River
  • Latitude: 44.664275
  • Longitude: -122.520889

ESU

  • Upper Willamette River Steelhead DPS
  • Upper Willamette River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • F.0 Public Outreach, Education, and Landowner RecruitmentY (Y/N)
    •      . . F.0.a Outreach, Education and Recruitment funding 97,554.00
    •      . . F.0.b.1 Amount of habitat protected -- acres .0
    •      . . F.0.b.2 Number of watersheds protected 19
    •      . . F.0.c Habitat treatments leveraged (LOV)
    •      . . F.0.e Restoration projects proposed 18
    •      . . F.1 Outreach / Education ProjectY (Y/N)
      •      . . . . F.1.a Outreach/ Education funding 48,777.00
      •      . . . . F.1.d Outreach documents/reports preparedY (Y/N)
        •      . . . . . . F.1.d.1 Documents/Reports 18,560
        •      . . . . . . F.1.d.2
          Name Of Document
          Multiple
      •      . . . . F.1.e Exhibits/posters preparedY (Y/N)
        •      . . . . . . F.1.e.1 Number of Exhibits 1
      •      . . . . F.1.f Media material preparedY (Y/N)
        •      . . . . . . F.1.f.1 Number of media materials prepared 31
        •      . . . . . . F.1.f.2
          Description Media Material And Where/When Used
          Mulitiple
      •      . . . . F.1.h Outreach events conductedY (Y/N)
        •      . . . . . . F.1.h.1 Number of Outreach/Education Events 15
      •      . . . . F.1.i Workshops/training eventsY (Y/N)
        •      . . . . . . F.1.i.1 Number of workshops/training sessions 5
        •      . . . . . . F.1.i.2 Number of workshops/training participants 150
      •      . . F.2 Landowner RecruitmentY (Y/N)
        •      . . . . F.2.a Landowner recruitment funding 48,777.00
        •      . . . . F.2.b.1 Acres of habitat affected .0
        •      . . . . F.2.c.1 Landowners ContactedY (Y/N)
          •      . . . . . . F.2.c.2 Number of Landowners Contacted 514
          •      . . . . . . F.2.c.3 Number of Plans Or Designs Developed 0