Salmon-Steelhead Recovery Planning
Salmonid Restoration Planning and Assessments
|
029 05 SC | Snake River | 10/05/2005 | 08/21/2006 | 2005 | Completed | 01/14/2025 | |
| |
Description
The original work plan placed more emphasis on completing public reviews of various elements of the Idaho salmon/steelhead recovery plan. During the project term, court decisions and requirement for data to respond to court mandates required that some of the recovery planning decisions be made earlier than projected. As a result, there was a short-term refocus on developing limiting factors for specific populations to be analyzed and included in NOAA Fisheries response to the court and in seeking public review of those documents.
Another deviation to the project was the addition of a comprehensive analysis of limiting factors on a watershed basis both to provide additional information for public review and to provide a basis for calculating the costs and magnitude of the recovery job. This added some time to the project, approximately one month, and increased the need for GIS support. A no cost amendment to extend the time was granted and the work was completed within the budget amount.
The project sponsor met the original objectives as the facilitator in establishing focus groups, planning of focus group meetings and reporting the results of those meetings with the overall goal of incorporating the review and comments from each focus group session into a final version of the Recovery Plan.
A website was created to display drafts for easy review and comment. The web address for the Early Draft Plan Chapters for Public Comment is: http://www.idahosalmonrecovery.net.
This project paved the way for additional measures to localize specific recovery actions at the population group or watershed level and to calculate the costs of recovery actions that are achievable and which will be effective.
Project Benefit
This project will contribute to the Idaho State Salmon-Steehead Recovery Plan addressing factors that limit abundance and distribution of Snake River Basin ESU-steelhead as well as the Snake River Spring/Summer run ESU and the Snake River Fall ESUs for chinook salmon.
Funding Details |
PCSRF | $26,000 |
State | $6,315 |
Report Total: | $32,315 |
|
| |
Worksites
Boise
- Worksite Identifier: Boise
- Start Date: 10/05/2006
- End Date: 08/21/2006
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Middle Snake-Boise (170501)
- Subbasin: Lower Boise (17050114)
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain:
- Latitude: 43.6185
- Longitude: -116.2002
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 21,545.00
- . . B.0.b.1
Area Encompassed 1.0
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 21,545.00
- . . . . B.1.b.1
Development of a Recovery PlanY (Y/N)
- . . . . . . B.1.b.1.a
Name of the Recovery Plan | |
Met with statewide resource agencies and interest groups to review draft documents on behalf of Idaho OSC Also at this worksite developed GIS layers to analyze residential development on floodplains and limiting factors for selected populations. |
- . . . . . . B.1.b.1.b
Description and Scope of the Recovery Plan | |
A plan was not to be developed through this work. Work conducted through contract tasks is to collect comment from agency staff and interest groups as input to draft recovery plans. |
Salmon Subbasin
- Worksite Identifier: Salmon Subbasin
- Start Date: 10/05/2005
- End Date: 08/21/2006
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Salmon (170602)
- Subbasin: Middle Salmon-Panther (17060203)
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 45.1756
- Longitude: -113.8958
ESU
- Snake River Spring/Summer-run Chinook Salmon ESU
- Snake River Fall Chinook Salmon ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 5,385.00
- . . B.0.b.1
Area Encompassed 8,949,760.0
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 5,385.00
- . . . . B.1.b.1
Development of a Recovery PlanY (Y/N)
- . . . . . . B.1.b.1.a
Name of the Recovery Plan | |
The scope of work was changed for this project as a result only one meeting was held in the Salmon subbasin to review draft recovery plan documents and to collect comments on behalf of Idaho OSC. |
- . . . . . . B.1.b.1.b
Description and Scope of the Recovery Plan | |
No plan will be developed. |
Clearwater Watershed
- Worksite Identifier: Clearwater Watershed
- Start Date: 10/05/2005
- End Date: 08/21/2006
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Clearwater (170603)
- Subbasin: Clearwater (17060306)
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 46.4012
- Longitude: -117.0011
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 5,385.00
- . . B.0.b.1
Area Encompassed 6,172,800.0
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 5,385.00
- . . . . B.1.b.1
Development of a Recovery PlanY (Y/N)
- . . . . . . B.1.b.1.a
Name of the Recovery Plan | |
The scope of work was changed for this project as a result only one meeting was held in the Clearwater subbasin to review draft recovery plan documents and to collect comments on behalf of Idaho OSC. |
- . . . . . . B.1.b.1.b
Description and Scope of the Recovery Plan | |
No plan was developed. |
|
|