Grand Ronde Tribes Fish Passage Improvement

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID531-xxxx-03-500-124Y
Recovery DomainsWillamette River
Start Date07/01/2003
End Date10/31/2005
Year2002
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


The Confederated Tribes of Grand Ronde improved fish passage to Upper Willamette ESU steelhead by removing or replacing a problem culvert with a bridge on Yoncalla creek. All assessment and design planning will follow the guidelines and meet the criteria of the Oregon Road-Stream Crossing Restoration Guide: Spring 1999 (Robison et al. 1999) referred to in the Oregon Aquatic Habitat Restoration and Enhancement Guide, May 1999.

Project Benefit    


Access to over 6 miles of Upper Willamette ESU steelhead habitat will be improved.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 1.00 6.00

Funding Details

SourceFunds
PCSRF$100,000
Report Total:$100,000


Project Map



Worksites

182    


  • Worksite Identifier: 182
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Willamette (170900)
  • Subbasin: Yamhill
  • Watershed: 1709000801
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Willamette River
  • Latitude: 45.1320133197103
  • Longitude: -123.662295374548

ESU

  • Upper Willamette River Steelhead DPS
  • Upper Willamette River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 100,000.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Project sites will be inspected for compliance with design specifications after completion and again after first high flows.
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 100,000.00
      •      . . . . C.2.b.1 Length of stream made accessible 1.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 6.00