Newaukum River - Lincoln Creek Habitat Improvement

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Instream Habitat Riparian Habitat Upland Habitat And Sediment
Project IDCH0002
Recovery Domains -
Start Date07/31/2001
End Date04/30/2002
Year2001
StatusCompleted
Last Edited01/31/2024
 
1 - 1

Description    


Off channel habitat connection, road decommission, livestock exclusion, revegetation. Overall improved habitat (27.5 acers): reconnect channel segments (4 ac), remove road (1,200 ft., 6 ac), exclude livestock (7.5 ac), revegetation (10 ac)

Project Benefit    


Improved habitat, water quality and quantity

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .23
Riparian Habitat
  Stream Miles Treated .60
  Acres Treated 14.0
Fish Passage
  Barriers Removed
  Miles Opened .50 .00

Funding Details

SourceFunds
PCSRF$71,250
Report Total:$71,250


Project Map



Worksites

32    


  • Worksite Identifier: 32
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Upper Chehalis
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 46.6072836005231
  • Longitude: -122.923785498725

ESU

  • Washington Coast Chinook Salmon ESU
  • Southwest Washington Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Southwest Washington Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .60
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      None
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Water Quality, effectiveness monitoring
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.b.1 Length of stream made accessible .50
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 2
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .25
      •      . . C.4 Instream Habitat ProjectY (Y/N)
        •      . . . . C.4.b Total length of instream habitat treated
        •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
          •      . . . . . . C.4.e.3 Miles of streambank stabilized
        •      . . C.5 Riparian Habitat ProjectY (Y/N)
          •      . . . . C.5.b.1 Total riparian miles streambank treated .60
          •      . . . . C.5.b.2 Total Riparian Acres Treated
          •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . C.5.e.1 Riparian exclusionY (Y/N)
          •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
            •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control
          •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
            •      . . . . C.6.b.1 Acres of upland habitat area treated
            •      . . . . C.6.b.2 Miles of road treated in upland area